Laserfiche WebLink
tbelow the surface . Surface structures include but are not limited to , buildings , <br /> tanks , walls , bridges , roads , dams , channels , open drainage , piping , poles , <br /> ' wires , posts , signs , markers , curbs , walks and all otherfacilities that are visible <br /> above the ground surface . <br /> C . Protection of Underground and Surface Structures : <br /> 1 . Sustain in -place and protect from direct or indirect injury, all underground and <br /> surface structures located within or adjacent to the limits of the Work . Such <br /> ' sustaining and supporting shall be done carefully, and as required by the party <br /> owning or controlling such structure . <br /> 2 . Assume all risks attending the presence or proximity of all underground and <br /> surface structures within or adjacent to the limits of the Work. CONTRACTOR <br /> shall be responsible for all damage and expense for direct or indirect injury <br /> caused by its Work to any structure . CONTRACTOR shall repair immediately <br /> f all damage caused by his work, to the satisfaction of the owner of the dam- <br /> aged structure . <br /> D . All other existing surface facilities , including but not limited to , guard rails , posts , <br /> guard cables , signs , poles , markers , and curbs which are temporarily removed to <br /> facilitate installation of the Work shall be replaced and restored to their original <br /> condition at CONTRACTOR'S expense . <br /> 1 . 7 PROTECTION OF THE WORK FROM STORMWATER RUNOFF <br /> A . Protect the Work from damage caused b stormwater runoff from rainfall . During <br /> g <br /> the course of construction , it is possible that heavy rains may occur. Clean all dirt <br /> tand debris from pipes and drainage structures , and repair all flooding , washouts , <br /> and other erosion damage to the Work caused by stormwater runoff, regardless of <br /> the state of completion of the Work , and until the Work is accepted by the <br /> OWNER , at no cost to the OWNER . <br /> 1 . 8 PROTECTION OF PRIVATE PROPERTY <br /> A . Assume full responsibility for the reservation of <br /> p y p all private property on or adjacent <br /> to the site and work area . If any direct or indirect damage is done by or on account <br /> of any act , omission , neglect or misconduct in the execution of the Work by the <br /> CONTRACTOR , it shall be restored by the CONTRACTOR , at its expense , to a <br /> condition equal to or better than that existing before the damage was done . This <br /> restoration includes but is not limited to , sprinkler systems , lawns and landscaping , <br /> lighting , driveways , etc . installed by private individuals or entities within public right- <br /> of-way. <br /> ' 1 . 9 PAYMENT <br /> Last revised 6/6/03 015414 PROJECT <br /> F:Tublic WorksVeithmstormwater Projects\Harmony Oaks Mitigation ProjectlConstruction Contract\Technical <br /> ' Specifications0vision 1 \Addendum #1 - 01541 - Protection of the Work and Property.doc <br />