Laserfiche WebLink
SECTION 01710 <br /> SITE CLEANUP AND RESTORATION <br /> 1 . 1 SCOPE <br /> A . Furnish all labor, equipment, appliances , and materials required or necessary <br /> rY <br /> to clean up and restore the site after the construction is completed . <br /> ' 1 . 2 REQUIREMENTS <br /> A . During the progress of the project, keep the work and the adjacent areas <br /> affected thereby in a neat and orderly condition . Remove all rubbish , surplus <br /> materials , and unused construction equipment . Repair all damage so that <br /> 1 the public and property owners will be inconvenienced as little as possible . <br /> Be Provide onsite containers for the collection of waste materials , debris , and <br /> ' rubbish and empty such containers in a legal manner when they become full . <br /> C . Where material or debris has been deposited in watercourses , ditches , <br /> gutters , drains , or catch - basins as a result of the CONTRACTOR' S <br /> operations , such material or debris shall be entirely removed and <br /> satisfactorily disposed of during the progress of the work , and the ditches , <br /> channels , drains , etc . , shall be kept clean and open at all times . <br /> D . Before the completion of the project, unless otherwise especially directed or <br /> permitted in writing : <br /> 1 . Tear down and remove all temporary buildings and structures ; <br /> 2 . Remove all temporary works , tools , and machinery, or other <br /> construction equipment furnished ; <br /> 3 . Remove all rubbish from any grounds occupied ; and <br /> 4 . Leave the roads , all parts of the premises , and all property affected by <br /> construction operations , in a neat and satisfactory condition . <br /> E . Restore or replace any public or private property damaged by construction <br /> work , equipment , or employees , to a condition at least equal to that existing <br /> immediately prior to the beginning of the operations . (This includes but is not <br /> limited to , items such as sprinkler systems , lawns and landscaping , lighting , <br /> driveways , etc. installed by individuals or entities within public right-of-way . ) <br /> Restore all private property and all highway, roadside , and landscaping work <br /> within any right-of-way, platted or prescriptive . Acceptable materials , <br /> equipment , and methods shall be used for such restoration . Reinstall all <br /> mailboxes removed during construction to the required height per the U . S . <br /> Last revised 3/26/03 01710- 1 HARMONY OAKS <br /> FAPublic Works\KeithM\Stormmter Projects\Harmony Oaks Mitigation Project\Construction Contract\Technical Specifications\Draft <br /> ' Specifications\Div-1 \01710 - Site Cleanup & Restoration .doc <br />