My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-165
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 12:12:30 PM
Creation date
10/1/2015 1:22:29 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/02/2008
Control Number
2008-165
Agenda Item Number
County Administrator Signature
Entity Name
HDR Engineering Inc.
Subject
Supplemental Agreement Services Phase 1 Oslo Road improvement
Area
Oslo Road - 27th Avenue
Supplemental fields
SmeadsoftID
8706
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUPPLEMENTAL AGREEMENT BETWEEN INDIAN RIVER O <br />,� <br />A �, :. <br />CIVIL RVGINEE-M <br />27TH AVENUE <br />This SUPPLEMENTAL AGREEMENT, entered into this p2 day of L! cam' <br />2008, by and between INDIAN RIVER COUNTY, a political subdivision of the S4 to of Florida, <br />hereinafter referred to as the COUNTY, and HDR ENGINEERING, INC., 2202 N. West Shore Boulevard, <br />Suite 250, Tampa, FL 33507-5755, hereinafter referred to as the ENGINEER, <br />WITNESSETH <br />WHEREAS, the ENGINEER is currently performing professional civil engineering services and <br />right-of-way cost estimations for the COUNTY for Phase I of the Oslo Road improvement project; and <br />WHEREAS, the COUNTY is in need of additional services with respect to right-of-way cost <br />estimates for parcels along 27`h Avenue; and <br />WHEREAS, the ENGINEER has agreed to perform the additional services for an additional <br />$4,805.00; and <br />WHEREAS, the parties mutually agree to supplement their earlier agreement to include additional <br />services as follows: <br />SECTION III - SCOPE OF SERVICES <br />In addition to the previous right-of-way cost estimates for roadway alternative design and related <br />services previously completed, the ENGINEER agrees to perform additional professional right-of-way cost <br />estimates along 27"h Avenue in connection with the project as follows: <br />1. The ENGINEER will research land use, existing site plans, recent sales and current <br />listings to provide for the right-of-way cost estimates. <br />2. The ENGINEER will an on-site inspection to each parcel provide field notes to <br />COUNTY in addition to the cost estimates. <br />3. The ENGINEER will provide the COUNTY with business damage estimates <br />provided by Jorge Moreno, CPA with the firm of Gerson, Preston, Robinson and <br />Company. <br />SECTION IV - TIME FOR COMPLETION <br />The time for completion of the supplemental right-of-way cost estimates and business damage <br />estimates shall be 20 days from notice to proceed. <br />SECTION V - COMPENSATION <br />The COUNTY agrees to pay and the ENGINEER agrees to accept the sum of $4,805.00 for <br />supplemental services rendered pursuant to this Agreement. <br />Except as supplemented above, the original agreement dated October 2007, shall remain <br />controlling and in full force and effect. <br />
The URL can be used to link to this page
Your browser does not support the video tag.