Laserfiche WebLink
STATUTORY CHECKLIST <br /> (continued page 3) <br /> SUMMARY OF FINDINGS AND CONCLUSION : <br /> As a result of the checklist process and review, it has been concluded that the project <br /> will not significantly impact the environment. Temporary increases in noise and dust <br /> due to construction will be minimal. <br /> SUMMARY OF ENVIRONMENTAL CONDITIONS : <br /> An evaluation of the project' s Environmental Impact has resulted in a conclusion that it is in conformance <br /> with all applicable Federal, State, and Local laws. <br /> No permanent effects to the environment from the proposed project have been detected. See Exhibits "F" & "G" . <br /> PROJECT MODIFICATIONS AND ALTERNATIVES CONSIDERED : <br /> Modification of the proiect has been considered, but no alternatives to the construction <br /> of the project have been found. A feasibility study was performed for the replacement of the Rockridge <br /> Subdivision Sewer System. The study indicated that the Vacuum System is the best approach. <br />