Laserfiche WebLink
ENVIRONMENTAL ASSESSMENT CHECKLIST <br /> (Continued page 6) <br /> Indian River County Disaster Recovery Initiative Grant # 06DB-3C- 10-40-01 -W14 <br /> SUMMARY OF FINDINGS AND CONCLUSIONS : <br /> This project will have no permanent impact on the environment. Temporary increases in noise <br /> and dust will be minimal . <br /> SUMMARY OF ENVIRONMENTAL CONDITIONS : <br /> This project has been reviewed for conformance with all applicable State, Federal, and Local laws <br /> to determine possible environment impacts. No permanent effects have been detected. See Exhibits <br /> "F" & "G". <br /> PROJECT MODIFICATIONS AND ALTERNATIVES CONSIDERED : <br /> The "No Project' alternative has been considered but is not feasible due to the Health and Safety issues <br /> associated with the need for the installation of the storm surge/flood protection system in the Rockridge <br /> Subdivision located in Service Area # 1 , the need for replacement of the existing low pressure sanitary sewer system <br /> with a vacuum system in the Rockridge Subdivision which is located in Service Area #2, the need for the installation <br /> of potable water lines within the West Wabasso Community and the hook up of the existing dwellings in the community <br /> to the new water system in Service Area #3 , the renovation of Fire Station #3 located at the Vero Beach Airport which <br /> serves Service Area # 4, the rebuilding of Fire Station #4 located in Oslo which serves Service Area #5 , and the renovation <br /> of Fire Station # 10 located in the City of Fellsmere which serves Service Area #6 . <br />