Laserfiche WebLink
J HNSONI SIT " Air <br /> CONT LS <br /> � � H <br /> Indian River Count Johnson Controls , Inc . <br /> Y Controls Group <br /> Sheriffs Administration Building Orlando, <br /> do, FloridaCourt <br /> Orlando, Floria 32808 <br /> Energy Management System Tel . 407 -291 - 1971 <br /> Installation <br /> Proposal <br /> Project: Energy Management System Installation November 3, 2004 <br /> Location : 4055 41 ST Ave. <br /> Vero Beach, Florida 32960- 1802 <br /> Attn : Lynn Williams <br /> Johnson Controls is pleased to propose the following : <br /> • Johnson Controls will provide submittals, installation, materials , and system validation per Indian River <br /> County, Sheriffs Administration Building plans M - 1 thru M -7 by TLC Engineering dated 7 -27-04 for <br /> the HVAC Controls . <br /> • Authorized Johnson Controls, Inc personal will perform all installation and programming. <br /> DDC Controls for the following : <br /> ( 5 ) Rooftop Units , RTU 1 -5 . <br /> ( 1 ) Air-handling Unit, AHU-6 . <br /> (32 ) VAV boxes . <br /> ( 1 ) Lon Interface to Chiller. <br /> (2) Chilled Water Pumps . <br /> (2 ) Computer Room Units , alarm monitor and room temperature. <br /> (5 ) Exhaust Fan Start/Stop . <br /> Specific items included with this proposal: <br /> ( 1 ) Network Automation Engine. <br /> *(6 ) Air Flow Monitoring Stations . <br /> ( 12 ) Chiller Water Valve/Actuators w/weatherproof covers . <br /> ( 1 ) LonWorks connection to Chiller. <br /> Clarifications <br /> • All wire will be plenum rated cable and in exposed areas wire will be in conduit . <br /> • Control devices will be Johnson Controls when available. <br /> • DDC control panels will be installed in mechanical rooms or computer room. <br /> • DDC control panels will need 120vac power provided by Div. 16 . <br /> • DDC control panels will use Johnson Controls N2 communications protocol . <br /> • Cost of Johnson Controls material is based on GSA pricing. <br /> Pagel of 3 <br />