My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-284
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2016 1:44:04 PM
Creation date
9/30/2015 8:25:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/09/2004
Control Number
2004-284
Agenda Item Number
None
Entity Name
Timothy Rose Contracting
Subject
Emergency Contract Highland Drive Storm Sewer Replacement
Hurricane Jeanne
Area
IRFWCD B-10 Canal
Archived Roll/Disk#
3224
Supplemental fields
SmeadsoftID
4729
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> HIGHLAND DRIVE STORM SEWER REPLACEMENT <br /> AT IRFWCD B- 10 CANAL <br /> .l <br /> This project is for the replacement of Two (2 )- 27 x 43" corrugated metal pipes plugged and <br /> collapsed during Hurricane Jeanne , with 1 - 48" x 76 " elliptical reinforced concrete pipe . The <br /> �.. work associated with this is as followed : <br /> 1 . Location - IRFWCD B- 10 Canal under Highland Drive ( Highland Drive south of 215« <br /> Street SW ) . <br /> 2 . Highland Drive has been , and will remain closed during construction between 13`h <br /> Avenue and 21 " Street SW . The roadway , Miami curb , and most of the existing 2-27" x <br /> 43 " CMP pipes have been removed and an open ditch exists . <br /> dw 3 . An existing metal drainage structure will be required to be removed and replaced with an <br /> FDOT J-7 manhole on the east side of Highland Drive . <br /> 4 . The proposed storm water improvement is in direct conflict with an existing active 10- <br /> inch water main located along Highland Drive , The existing water main shall be <br /> 'W abandoned in place , where feasible , and a new ductile iron water main installed that will <br /> allow for installation of the storm water improvements . The following is a general <br /> overview of the work to be performed . <br /> 4a . A 10-inch asbestos cement (AC) water main is conflicting with the proposed construction <br /> of the storm drainage pipe and must be lowered. <br /> +� 4b . Isolate the existing AC water main on each side of the proposed pipe crossing . Provide <br /> temporary water service to existing residential 'homes impacted by the water main shut <br /> down . <br /> .. 4c . Isolate the section of main to be abandoned / shutdown. Install a line -stop valve on each <br /> side of the pipe crossing . Provide thrust restraints to prevent movement of the installed <br /> valve . <br /> 4d. Remove or abandon in-place the 10 -inch AC pipeline . Only pipe that has been pressure <br /> grouted or crushed in-place will be accepted as abandoned. <br /> 4e . Install ductile iron water main along with four (4) ductile iron 45 -degree fittings to the <br /> Aw proper depth of cover to cross under the storm drain lines . <br /> 4f. Install two (2) 10-inch gate valves with valve boxes & cover. A 10 -inch gate valve shall <br /> be installed on each side of the pipe crossing . <br /> 4g. Install blow off taps and flush the isolated section of water main while introducing liquid <br /> "` chlorine (disinfectant) . The use of chlorine tablets is prohibited . <br /> 4h . Perform hydrostatic pressure test to 125 -psi minimum for 2-hours . <br /> 4i . Perform 2 -day bacteriological testing and analysis pursuant to FDEP . <br /> " 4j . All work is to be performed in accordance with Indian River County Utility Services <br /> design & construction standards as well as the Florida Department of Environmental <br /> Protection (FDEP) . <br /> 5 . 48" x 76 " ERCP pipe will be installed , backfilled and roadway constructed ( 10 " shellback <br /> base (2 lifts ) and 2" Type S - 1 Asphaltic Concrete ) . Miami curb shall be installed and <br /> .. match line and grade of existing Miami curb (approximately 56 LF ) . <br /> 6 . All disturbed areas shall be sodded with bahia sod or match existing . <br /> 7 . Rubble Rip Rap shall be instil et :; on the west side of the proposed 48 " x 76" ERCP . <br /> aw 8 . Guardrail shall be reset on west side of Highland Drive . <br /> 9 . All work is to be performed in accordance with FDOT Standard Specifications for Road <br /> and Bridge Construction (2004 ) , <br /> dr <br />.r <br /> do FAEngineeringZapital Projects\Highland Drive Storm Sewer ReplacementWEANNE EMERGENCY CONTRACT 2004.doc 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.