My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-244
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 11:24:12 AM
Creation date
9/30/2015 8:17:46 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/12/2004
Control Number
2004-244
Agenda Item Number
None
Entity Name
Barth Construction
Subject
Emergency Contract Sheriff's Office
Hurricane Frances and Hurricane Jeanne
Archived Roll/Disk#
3224
Supplemental fields
SmeadsoftID
4578
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sheriff's Building <br /> Reconstruction <br /> Non -Storm Related <br /> Detective <br /> Repair drywall , patch and paint areas in rooms # 800 - 803 where walls <br /> were removed . <br /> Repair drywall , patch and paint areas in rooms # 706 - 709 and # 712 - <br /> 714 . <br /> Crime Scene <br /> Install 3 '0 "x 618 " steel one hour fire rated door and jamb ( include <br /> hinges and closer) in opening created in room # 301 . Include form and <br /> pour of concrete and drywall repair as needed . <br /> Install door and jamb in opening created in east wall of room # 300a <br /> non rated ) <br /> Patch area of wall room # 302 where partition removed . <br /> Close door opening between room # 300 and # 301 . Cover west side of <br /> same wall with 1/a " drywall to provide suitable finish . <br /> Armory <br /> Install 3 '0 " x 6 '8 " steel one hour rated door and jamb ( include hinges <br /> and closer) in opening created in room # 606 . Include form and pour of <br /> concrete and drywall as needed . <br /> Construct drywall partition in room # 606 . ( extend width of room 615 ) <br /> Partition should be constructed to the bottom of the roof deck ( drywall <br /> both sides ) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.