Laserfiche WebLink
2 . WORK . The work under this Contract shall be as more fully set forth in Exhibit A <br /> attached to this Contract and made a part hereof by this reference (collectively , the 'Work 11 ) <br /> in connection with the County's repair of the Indian River County Sheriff' s Office <br /> ( " Project" ) . The parties acknowledge and agree that the Contractor has received a set of <br /> engineer drawings for the Indian River County Sheriff' s Office from the County , and that <br /> the foregoing drawings are not attached to this Contract due to their voluminous nature . It <br /> is mutually agreed between the parties hereto that time is of the essence of this Contract . <br /> 2 . 1 . Extra or Additional Work . Without invalidating this Contract , the County may at any <br /> time , by written change order and without preliminary notice to the surety , order extra work <br /> within the general scope of this Contract ; request additional work ; or alter the work by <br /> addition or reduction , and the contract price will be adjusted accordingly . <br /> 2 . 2 . Suspension of work . The County shall have the right to suspend work wholly or in <br /> part for such period or periods as may be deemed necessary due to unsuitable weather or <br /> other conditions which the County considers unfavorable for the work to proceed . No <br /> delay damages or allowance of any kind will be made for such suspension of work ; <br /> Contractor' s sole remedy shall be an extension of time for completion of the Contract . <br /> 2 . 3 . Coordination/Cooperation . The County and its authorized representatives shall be <br /> permitted proper and safe access to the Work at the Project site , and all reasonable <br /> opportunity for the inspection of all Work and materials at the Project . The County <br /> reserves the right to perform activities in the area where Work is being done under this <br /> Contract with its own forces . The County reserves the right to permit other Contractors to <br /> work within the area where Work is being done under this Contract . Contractor shall <br /> afford the County , and other Contractors , proper and safe access to the Work at the <br /> Project site , and all reasonable opportunity for the introduction and storage of their <br /> equipment , materials and the execution of their work concurrently . Contractor shall not <br /> endanger any work of others by cutting , excavating , or otherwise altering their work and <br /> will only cut or alter their work with the written consent of the County' s project manager <br /> and the others whose work will be affected . The County shall have sole authority and <br /> responsibility for such coordination . The County' s project manager is Lynn Williams , <br /> Indian River County Building and Grounds Superintendent . <br /> 2 . 4 , Differing Site Conditions , The Contractor shall promptly , and before such <br /> conditions are disturbed , notify the County in writing of: ( 1 ) subsurface or latent physical <br /> conditions at the Project site differing materially from those indicated in this Contract ; or (2 ) <br /> unknown physical conditions at the Project site of an unusual nature , differing materially <br /> from those ordinarily encountered and generally recognized as inherent in Work of the <br /> character provided for in this Contract . The County will promptly investigate the <br /> conditions , and if the County finds that such conditions do materially so differ and cause an <br /> increase or decrease in the Contractor' s cost of, or the time required for, performance of <br /> any part of the Work under this Contract , an equitable adjustment shall be made and the <br /> Contract modified in writing accordingly . <br /> 2 . 5 . Independent Contractor. Contractor represents that it is fully experienced and <br /> properly qualified to perform the Work under the Contract and that it is properly licensed , <br /> equipped , organized and financed to perform such Work . Contractor shall act as an <br /> 3 <br />