My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-212J
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-212J
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 11:52:45 AM
Creation date
9/30/2015 7:57:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
09/14/2004
Control Number
2004-212J
Agenda Item Number
County Administrator Signature
Subject
Second Amended and Restated Emergency Order 2004-04
Hurricane Frances and Hurricane Jeanne
Temporary Structures
Archived Roll/Disk#
3223
Supplemental fields
SmeadsoftID
4273
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> 2 . The temporary modular or mobile home must be set back 10 ' from <br /> property lines (front , rear or side ), except for non-conforming lots <br /> and corner lots. For non-conforming lots and corner lots the <br /> community development director or his designee may waive or <br /> reduce the 10 ' setback requirement. <br /> 3 . All other approvals ( health department , utilities , building ) must be <br /> obtained . <br /> 4 . Use must cease upon completion of home repairs or by December 31 , <br /> 2005 . E 3895 whichever occurs first , unless extended by the <br /> community development director or his designee for good cause <br /> shown . <br /> B . Temporary Commercial Structures ( Including Industrial Multi - Family Church <br /> Private School sites : <br /> Temporary Modular or Mobile Structures are allowed based on the following <br /> guidelines : <br /> • Modular or mobile structures require planning approval through the <br /> Planner-of-the- Day for a Temporary Use Permit (TUP ) . <br /> • Must obtain a " set-up permit" from the Building Division . <br /> • All modular structures and mobile homes must be approved by the <br /> certifying authority ( DCA or HUD ) for the proposed use ( i . e . office , <br /> place of assembly etc) . <br /> • Temporary use must cease upon completion of heme building repairs <br /> or by December 31 , 2005 , whichever occurs first , <br /> unless extended by the community development director or his <br /> designee for good cause shown . <br /> The following criteria apply to the POD sign -off for commercial TUP review: <br /> 1 . The modular or mobile structure cannot be located in an easement or <br /> right-of-way . <br /> 2 . The temporary modular or mobile structure can be located in setbacks <br /> provided it does not conflict with required landscape areas . The <br /> minimum setbacks are 10 ' front and rear and 4 ' on the sides . <br /> 3 . Temporary modular or mobile structures can be located within the <br /> parking lot provided that no more than 30 % of the required parking is <br /> occupied by the modular structure . <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.