Laserfiche WebLink
err► Table IX-2 provides a summary of the cost per square foot by school type, as well as the <br /> cost per student station, based on the current LOS for each school type . The result is a <br /> weighted average cost per student station of $21 , 897 . <br /> Table lX =2 <br /> Facility Cost per Student Station <br /> S ware Feet er Student Station (LOS)« 144. 71 <br /> 117 .261 147. 57 139 . 07 <br /> School Facility Cost Components : <br /> Construction Cosi per Square Foot(2) $92. 56 $ 131 . 81 $ 138 . 60 $ 128 . 31 <br /> Design Cost per Square Foot(') $4.63 $6. 59 $6. 93 $6 .42 <br /> Engineering Cost per Square Foot(4) $0.46 $0 . 66 $0.69 $0.64 <br /> Utilities Connection Cost per Square Foot(4) $0.46 $0. 66 $0. 69 $0. 64 <br /> FF&E Cost per Square Foot(5) $8 .33 $ 11 . 86 $ 12.47 $ 11 . 55 <br /> Land Cost per Square Foot(6) $8 . 58 $ 11 . 09 $9. 74 $9. 89 <br /> Total Facility Cost per Square Foot $ 115 . 02 $ 162. 67 $ 169 . 12 $ 157.45 <br /> FacilityCost per Student Station�'� $ 16,644. 54 $ 19,074 . 68 $24,957 . 04 $21 , 897 . 13 <br /> ( 1 ) Source : Table IX- 1 <br /> (2 ) Source : Florida Department of Education maximum construction cost per student station <br /> factors for January 2005 , based on Consumer Price Index . Includes construction of facility <br /> only - furniture and equipment not included in cost. <br /> `' •• (3 ) Design costs based on 5 percent of the total construction cost per square foot, based on <br /> information provided by the IRC School District on recent schools constructed in IRC . <br /> (4) Engineering and utility connection costs based on 0 . 5 percent of the total construction cost <br /> per square foot, based on information provided by the IRC School District on recent <br /> schools constructed in IRC . <br /> (5 ) FF&E costs based on 9 percent of the total construction cost per square foot, based on <br /> information provided by the IRC School District on recent schools constructed in IRC . <br /> (6) Based on a cost of $34, 136 per acre using recently purchased vacant land parcels of 40 to <br /> 130 acres (Source : Appendix B , Table B -2). The land cost per acre is then multiplied by 20 <br /> acres per elementary, 40 acres per middle, or 80 acres per high school . Land cost per <br /> square foot is determined by multiplying the prototypical number of acres for each school <br /> type by the cost per acre of $34, 136 and dividing by the average square footage per school <br /> type ( 81 , 164 square feet for elementary, 123 , 123 for middle, and 279,294 for high schools). <br /> The average square footage by school type is calculated by multiplying the square feet per <br /> student station by the maximum number of student stations for new schools, per IRC <br /> School District. <br /> (7) Total facility cost per square foot multiplied by the number of square feet per student <br /> station (Item 1 ) for each school type. <br /> Y�r <br /> Tindale-Oliver & Associates, Inc. Indian River County <br /> February 2005 IX-7 Impact Fee Study <br />