My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-094
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2016 11:45:47 AM
Creation date
9/30/2015 8:32:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Report
Approved Date
03/15/2005
Control Number
2005-094
Agenda Item Number
Jt. Mtg.
Entity Name
Tindale-Oliver & Associates
Subject
IR County Impact Fee Study Final Report
Archived Roll/Disk#
"
Supplemental fields
SmeadsoftID
4830
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VNIOW <br /> Cost Component <br /> Historical/Replacement Capital Costs <br /> Table III - 5 summarizes historical and replacement costs of existing buildings based on <br /> the information provided by the County . The land value for correctional facilities shown <br /> in the table represents the replacement value and not the historical value . According to <br /> information provided by County representatives, the historical cost of land was $ 68 , 638 <br /> for 9 . 81 acres . The County ' s estimate of replacement value for this land is $ 343 , 175 (or <br /> $34 , 982 per acre), which represents an increase of 400 percent over the past 21 years . <br /> As presented , the future expansion cost is $ 51 , 633 per bed (2004 dollars) . The land cost <br /> included in this cost is based on $ 35 ,467 per acre, which is consistent with the <br /> replacement land cost used for the existing land . The building replacement cost is $232 <br /> per square foot based on the estimates provided by the Public Works Department and the <br /> Office of Management and Budget. The land cost of $ 35 ,467 per acre and building cost <br /> of $232 per square foot are used in impact fee calculations since they reflect the most <br /> accurate estimated cost to build the addition to the correctional facilities . <br /> Table III =5 <br /> Land & Buildings Cost( ' ) <br /> Current Buildings <br /> IRC Correctional Facility Phase 1 1987 N/A N/A 54,273,234 <br /> IRC Correctional Facility Phase 11 1988 N/A N/A 52,275,084 <br /> IRC Correctional Facility Phase 111 1991 N/A 67,716 4l I N/A 55,597,251 <br /> Miscellaneous Buildings on Site(3) <br /> Guardhouse N/A N/A 100 N/A $ 13,000 <br /> Guardhouse N/A N/A 100 N/A 513,000 <br /> Land for Correctional Facilities t0l 1983 9. 81 N/A $343, 175 N/A <br /> Total Current 411 <br /> $ 12,514,745 <br /> Cost per Bed 5301450 <br /> Future Expansion <br /> Hammond Parcel for Future Jail Expansion 1 2003 1 25. 896 1 N/A S 918,466.00 N/A <br /> BRC Jail Ex ansion 2004/06 N/A 52,985 256 $ 12,299,637 <br /> Total Future Ex ansion 256 $ 13,218, 103 <br /> Future Expansion Cost per Bed $51 ,633 <br /> ( 1 ) Source : Public Works Department, General Services Department, and Office of Management <br /> and Budget, IRC <br /> (2) For existing buildings, historical cost is shown. <br /> (3 ) Total cost of miscellaneous buildings was provided by IRC . The cost was distributed among <br /> buildings based on the percentage of square feet. <br /> (4) The Correctional Facility Detention Complex and the Sheriffs Administration Building are <br /> located at the same site . Based on the review of aerial photos included in the "Needs <br /> Assessment and Master Plan for the Correctional Facility," it was determined that each <br /> occupies 50 percent of the site. <br /> The historical cost for equipment is shown in Table 111-6 . The replacement cost for <br /> equipment was not available . Using historical (acquisition) values, however, results in a <br /> conservative estimate of equipment cost. The total cost was obtained from the IRCSO <br /> Tindale-Oliver & Associates, Inc . Indian River County <br /> February 2005 III-7 Impact Fee Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.