Laserfiche WebLink
D . Funding Sources ( round figures to the nearest dollar) <br /> The maximum FEMA share for HMGP/FMA projects is 75% . The other 25% can be made up of State and Local funds as well as in- <br /> kind services . Moreover, the FMA program requires that the maximum in-kind match be no more than 12. 5 % of the total project costs . <br /> HMGP/FMA funds may be packaged with other Federal funds , but other Federal funds (except for Federal funds which lose their Federal <br /> identity at the State level - such as CDBG , ARS, HOME) may not be used for the State or Local match . <br /> Estimated FEMA Share $ 305 , 558 7 % of Total (maximum of 75 %) <br /> Non-Federal Share <br /> Estimated Local Share $ _551 ,, 465 93 % of Total (Cash) <br /> $ % of Total (In-kind) <br /> Estimated State Share $ % of Total (Cash) <br /> $ % of Total (In-kind) <br /> Other Agency Share $ % of Total <br /> (Identify Other Non-Federal Agency <br /> Total Funding sources from above $ 3 , 957 , 023 100 _Total % (should equal 100%) <br /> Other Non-FEMA Federal Funds $ (Do not include in total) <br /> (Identify Other Federal Agency <br /> E . Project Schedule <br /> List the major milestones in this project by providing an estimated time-line for the critical activities. <br /> (e.g. Designing, Engineering, Permitting, etc.) <br /> Schedule Number n Months to Com Tete <br /> Ex. Demolition of 6 structures and removal of debris 1 month <br /> Co Designing <br /> lete <br /> Rnainpprina <br /> Countyespntatinn Ito r .2001 <br /> Construction <br /> * Grant request and building construction NOT dependent on county funding . <br /> Construction funded through private contributions and local fundraising , <br /> 7 <br /> Attach any continuations or additional items to this page <br />