My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/1/1962
CBCC
>
Meetings
>
1960's
>
1962
>
10/1/1962
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 10:00:13 AM
Creation date
6/10/2015 8:24:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
10/01/1962
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FURTHER, that any unpaid amount of the contract sum shall become <br />due and payable on the 31st day after such final certification if <br />inspection by said Board shall not reveal sufficient cause to pre- <br />vent acceptance by said Board. <br />Before issuance of final certificate the Contractor shall <br />submit evidence satisfactory to the Architect that all payrolls, <br />material bills, and other indebtedness connected with the work <br />have been paid. <br />ARTICLE 6. THE CONTRACT DOCUMENTS. <br />The General Conditions of the Contract, the Supplementary <br />General Conditions, the Specifications and the Drawings, together <br />with this Agreement, form the Contract, and they are as fully a <br />part of the Contract as if hereto attached or herein repeated. <br />The following is an enumeration of the Specifications and Drawings: <br />WORKING DRAWINGS: i <br />Sheet #A-1 Foundation, Site Plan & Schedule <br />Sheet #A-2 First Floor Plan & Schedule <br />Sheet #A-3 Second Floor Plan & Schedule <br />Sheet #A-4 Elevations- Section <br />Sheet #A-5 Sections &'Interior Details - <br />Sheet #A-6 Wall Section - Kitchen &. <br />Miscellaneous Details <br />Sheet #A-7 Jail Equipment Details <br />Sheet #A-8 Jail Equipment Details <br />Sheet #S-1 Structural Plans & Schedules <br />Sheet #HVAC -1 First Floor Plan <br />' <br />- Sheet #HVAC -2 Second Floor Plan <br />Sheet #P-1 First Floor Plan Plumbing & Details <br />..Sheet #P-2 _ Second Floor Plan Plumbing & Details <br />,.SPECIFICATIONS: <br />..Section #0-1 Wage Determination Schedule <br />Section #0-2 Certificate of -Contract Completion <br />• <br />Section #0-3 Alternates <br />Section #1 Advertisement for Bids <br />Section -#2 Form of Proposal <br />Section #3 Instructions to Bidders <br />. Section #5 AIA General Conditions & Supplementary, <br />' <br />Section #6 Special Conditions for Jall Constructipu <br />,Section #7 List of Drawings <br />Section #8. Bork & Equipment by Owner <br />3. <br />LAMfO i 10"17 R: COULD VERO BEACH, FLORIDA <br />z. , ' . <br />
The URL can be used to link to this page
Your browser does not support the video tag.