My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-323
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-323
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:20:09 PM
Creation date
9/30/2015 10:03:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Plan
Approved Date
09/19/2006
Control Number
2006-323
Agenda Item Number
9.A.3.
Entity Name
IRC 2020 Comprehensive Plan
Subject
Capital Improvements Element-Chapter 6
Supplemental fields
SmeadsoftID
5834
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br /> • 147 . 57 building square foot per student station (High School) <br /> ➢ Solid Waste (Countywide) <br /> • 2 .2 tons per capita per year or 3 . 67 cubic yards per capita for permanent plus weighted <br /> peak seasonal population per year <br /> ➢ Stormwater Management <br /> • New drainage systems shall mitigate the impacts of a 25 year/24 hour design rainfall <br /> event <br /> • Minimum road crown elevation for existing roads shall be raised during <br /> resurfacing/rebuilding to the flood elevation resulting from the 2 year/24 hour storm <br /> event on local roads <br /> • The center two lanes of rebuilt roads must be at or above flood levels resulting from a <br /> 10 year/24 hour storm event on Arterial and Collector roads <br /> • All drainage basins will meet the following level-of-service standards : <br /> • By 2000 - 2 year/24 hour storm event <br /> • By 2005 - 5 year/24 hour storm event <br /> • By 2010 - 10 year/24 hour storm event <br /> ➢ Transportation (Roadways) <br /> • Level-of-Service "D" during peak hour, peak season, and peak direction conditions on <br /> all TRIP brant ftmded roadways as well as all freeway, arterial and collector <br /> roadways, with the exception of the following two, which will operate at level of <br /> service "E" plus 20% : <br /> • 27`h Ave — South County Line to SR 60 <br /> • 43 `a Ave - Oslo Road to 16`h Street <br /> For SIS./Florida Intrastate Highway System roadways, level of service `B" is adopted <br /> for rural areas, and level of service "C" is adopted for urban areas. <br /> ➢ Transit <br /> • One-hour headways shall be maintained on all fixed transit routes <br /> Level-of-service standards are discussed in further detail in each individual Comprehensive Plan <br /> Element. <br /> Capital Improvements Program <br /> A capital improvements program (CIP) is a program for capital expenditures to be incurred each year <br /> over a fixed period of years to meet anticipated capital needs . This program identifies projects that <br /> the county plans to undertake and presents an estimate of the costs and the full resources needed to <br /> finance the projects . <br /> Community Development Department Indian River County <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.