My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-322
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-322
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:19:25 PM
Creation date
9/30/2015 10:03:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Plan
Approved Date
09/19/2006
Control Number
2006-322
Agenda Item Number
9.A.2.
Entity Name
IRC 2020 Comprehensive Plan - Chapter 4
Subject
Transportration Element
Supplemental fields
SmeadsoftID
5833
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Transportation Element <br /> E=,ven though the NPed- c; Plnii identifies the readway improvements that -are feqb4ed to maintain <br /> an ade"ate level of , <br /> there are soine eirEamstanees whereby polie- , no!allow an impfavemeirt to be uridertaken. 9 r <br /> in the case of these t�Ate readways, proposed widening projeets geoemted conqiderable <br /> oppe ition. The proposed imprevemems were pefeeived as leading to higher volumes of tm <br /> higher tra;,rel speeds, increased noise levels, and reduced safaty . Af4er eensidering4he4fa4eeffs-. <br /> the BGC detemined that eengestiort on these roadways was an aeeeptable alternative to <br /> them. Beeause a ! formed seetions of these twoc <br /> raoa o . <br /> _.roads, some F i � � r, , That ligtea cccm_ c w <br /> h t- een exet a a from the 2025 Cost Feasible ot ., ,, <br /> Road widening projects in the LRTP 3025200 Cost Feasible Plan are identified in Table 4 . 9 . 1 . <br /> The total cost of the road improvements in Table 4 .9 . 1 is $38-""581 . 3 million. The following <br /> observations can be made about the final 3025200 roadway network: <br /> • Major state road improvements include I-95 (from N. County Line to S . County Line), <br /> SR 60 (from W. County Line to 66h Ave), and US 1 (from S . County Line to 4th Street @ <br /> Indian River 13I3,-d.Blvd and from Aviation Blvd to CR 510). <br /> • The improvement to Indian River Blvd (from 4"' Street Palm Point to 37' <br /> Street) to six lanes coupled with the extension of Aviation Blvd from US I to Indian <br /> River Blvd provides significant new roadway capacity to relieve projected traffic on US 1 <br /> through Vero Beach. <br /> • Major road improvements in the southern portion of the county include Oslo Road (from <br /> I-95 to Old Dixie Hwyto four lanes, the I-95/Oslo Road interchange, cast/west roads (81h <br /> Street, 16th Street, 26 Street, 53rd Street, Aviation Blvd), and north/south roads (43 `d <br /> Avenue, 58h Avenue, 66th Avenue) . <br /> • Major road improvements in the northern portion of the county include CR 512 (from I- <br /> 95 to Roseland Road) , CR 510 (from CR512 to US 1 ), Barber Street (from US I to <br /> Schumann Drive) to four lanes , Schumann Drive (from CR 510 @ 66`h Avenue to Barber <br /> Street) to four lanes, the extension of Laconia St to CR 510, and the extension of Fleming <br /> Street to US 1 . <br /> An analysis of the system-wide impacts of the adopted Cost Feasible Plan appears in Table 4 .9 .2 . <br /> These statistics represent system-wide comparisons, and include volume/capacity ratios, total <br /> accidents , and pollutant emissions. <br /> During the course of developing the Cost Feasible planthe county considered several <br /> alternatives to road widening in response to public comments and potential impacts to <br /> surrounding neighborhoods Two examples of this were the consideration of alternatives to <br /> widening 27th and 43 '0 Avenues . <br /> Community Development Department Indian River County 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.