Laserfiche WebLink
Uy~ <br />on or about the first day of each month ninety per cent <br />(90x) of the value, based on the Contract prices of labor and <br />incorporated in the work and of materials suitably <br />at the site thereof or at nose other location agreed upon <br />In writing by the parties up to the previous day of that month, <br />as estimated by the Architeot, less the aggregate of Previous Pay- <br />s; and upon substantial completion of the entire work, a sun <br />icient to Increase the total payments to ninety per cent (9M) <br />11of the Contract price. <br />,ASTICLZ S. ACCBPTAN'CA AND FINAL PATUMT. <br />Upon receipt of written notice from the Contractor that the <br />In ready for final inspection and acceptance, the Architect <br />promptly make such inspection and, if he Minds the work <br />and the Contract and the Contract fully performed, <br />shall parasptly issue a final certificate, over his signature, <br />,ting that the work provided for is this Contract has been. cam - <br />and is accepted by him under the terms and conditions <br />and that the satire balance found to be due the Contractor,and <br />od in said final certificate, is due and payable. However, the <br />balamoo farad to be due the Contractor, . and noted in, said <br />Taal owtificate, shall not be paid until the work shall have <br />inspected and accepted by the Hoard of County Carmissioners <br />f indica Invent County, Flveida, a", anything herein to the con- <br />traty <br />notVithstandiaj, not less than teas per cent (10x) of the <br />t!aoI MW Niall remain as<paid until wah iaspoctim and ac- <br />' of the Wath by the bard of County CONLt siefte rs of Indian <br />war ©ernnty, r34rida, PMD, HE19i'hgt, that 4"0" inspect ion by <br />shah be eeyriebd wi"is thirty (30) days after the f <br />test Mli*ers said final seelt�ltaate to said leard, art, ' <br />UMO tMber. that MW d tuft of the ocattaot wawa shall <br />urw OPM how IL eoouLO VVtO KACH, aanaA <br />