Laserfiche WebLink
§ 3.3.3 Providing consultation concerning replacement of Work damaged by fire or other <br />cause during construction, and furnishing services required in connection with the <br />replacement of such Work. <br />§ 3.3.4 Providing services in connection with a ^WbIia heaFiR9, arbitration proceeding or <br />legal proceeding, except where the Design/Builder is a party thereto. <br />§ 3.3.5 Providing coordination of construction performed by the Owner's own forces or <br />separate contractors employed by the Owner, and coordination of services required in <br />connection with construction performed and equipment supplied by the Owner. <br />§ 3.3.6 Preparing a set of reproducible record documents or electronic data showing <br />significant changes in the Work made during construction. <br />§ 3.3.7 Providing assistance in the utilization of equipment or systems such as <br />preparation of operation and maintenance manuals, training personnel for operation and <br />maintenance, and consultation during operation. <br />ARTICLE 4 TIME <br />§ 4.1 Unless otherwise indicated, the Owner and the Design/Builder shall perform their <br />respective obligations as expeditiously as is consistent with reasonable skill and care <br />and the orderly progress of the Project. <br />§ 4.2 Time limits stated in the Contract Documents are of the essence. The Work to be <br />performed under this Part 2 Agreement shall commence upon receipt of a notice to <br />proceed unless otherwise agreed and, subject to authorized Modifications, Substantial <br />Completion shall be achieved on or before the date established in Article 14. <br />§ 4.3 Substantial Completion is the stage in the progress of the Work when the Work or <br />designated portion thereof is sufficiently complete in accordance with the Contract <br />Documents so the Owner can occupy or utilize the Work for its intended use. <br />§ 4.4 Based on the Design/Builder's Proposal, a construction schedule shall be provided <br />consistent with Section 4.2 above. <br />§ 4.5 If the Design/Builder is delayed at any time in the progress of the Work by an act <br />or neglect of the Owner, Owner's employees, or separate contractors employed by the <br />Owner, or by changes ordered in the Work, or by labor disputes, fire, unusual delay in <br />deliveries, adverse weather conditions not reasonably anticipatable, unavoidable <br />casualties or other causes beyond the Design/Builder's control, or by delay authorized <br />by the Owner pending arbitration, or by other causes which the Owner and <br />Design/Builder agree may justify delay, then the Contract Time shall be reasonably <br />extended by Change Order. <br />