My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-167
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2016 5:01:24 PM
Creation date
9/30/2015 9:43:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/16/2006
Control Number
2006-167
Agenda Item Number
14.A.2.
Entity Name
Donadio & Associates
Subject
Part II Agreement Review-IRC Fire Station No. 4
Project Number
#5018.001.4.1.2
Supplemental fields
SmeadsoftID
5636
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 12 TERMINATION OF THE AGREEMENT <br />§ 12.1 TERMINATION BY THE OWNER <br />§ 12.1.1 This Part 2 Agreement may be terminated by the Owner upon 14 days' written <br />notice to the Design/Builder in the event that the Project is abandoned. If such <br />termination occurs, the Owner shall pay the Design/Builder for Work completed and for <br />proven loss sustained upon materials, equipment, tools, and construction equipment <br />and machinery, including reasonable profit and applicable damages. <br />§ 12.1.2 If the Design/Builder defaults or persistently fails or neglects to carry out the <br />Work in accordance with the Contract Documents or fails to perform the provisions of <br />this Part 2 Agreement, the Owner may give written notice that the Owner intends to <br />terminate this Part 2 Agreement. If the Design/Builder fails to correct the defaults, <br />failure or neglect within seven (7) days after being given notice, the Owner may then <br />give a second written notice and, after an additional seven (7) days, the Owner may <br />without prejudice to any other remedy terminate the employment of the Design/Builder <br />and take possession of the site and of all materials, equipment, tools and construction <br />equipment and machinery thereon owned by the Design/Builder and finish the Work by <br />whatever method the Owner may deem expedient. If the unpaid balance of the <br />Contract Sum exceeds the expense of finishing the Work and all damages incurred by <br />the Owner, such excess shall be paid to the Design/Builder. If the expense of <br />completing the Work and all damages incurred by the Owner exceeds the unpaid <br />balance, the Design/Builder shall pay the difference to the Owner. This obligation for <br />payment shall survive termination of this Part 2 Agreement. <br />§ 12.2 TERMINATION BY THE DESIGN/BUILDER <br />§ 12.2.1 If the Owner fails to make payment when due in accordance with the Florida <br />Prompt payment Act, FS& 218.70 et seq., the Design/Builder may give written notice of <br />the Design/ Builder's intention to terminate this Part 2 Agreement. If the Design/Builder <br />fails to receive payment in accordance with the Florida Prompt payment Act, FSS <br />218.70 et seg. within seven n) days after reGeipt of Inh netire by the QWRe. the <br />Design/Builder may give a second written notice and, seven (7) days after receipt of <br />such second written notice by the Owner, may terminate this Part 2 Agreement and <br />recover from the Owner payment for Work executed and for proven losses sustained <br />upon materials, equipment, tools, and construction equipment and machinery, includinc <br />reasonable profit and applicable damages. <br />ARTICLE 13 BASIS OF COMPENSATION <br />The Owner shall compensate the Design/Builder in accordance with Article 5, <br />Payments, and the other provisions of this Part 2 Agreement as described below. <br />§ 13.1 COMPENSATION <br />§ 13.1.1 For the Design/Builder's performance of the Work, as described in Section 3.2 <br />and including any other services listed in Article 14 as part of Basic Services, the Owner <br />shall pay the Design/Builder in current funds the Contract Sum as follows: <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.