Laserfiche WebLink
ATTACHMENT "B" <br />Station #4 <br />Plan Sheets <br />Sheet 9 <br />Title <br />Date <br />Cover Sheet <br />3/1/06 <br />ABB <br />Abbreviations/General Notes <br />2/6/06 <br />ACC <br />Accessibility Details <br />2/6/06 <br />A-1 <br />Existing Site Plan <br />2/6/06 <br />A-2 <br />Proposed Site Plan <br />2/6/06 <br />A-3 <br />Building Plan <br />3/7/06 <br />A-4 <br />/4" Floor Plan (North Portion) <br />3/1/06 <br />A-5/4" <br />Floor Plan (South Portion) <br />3/7/06 <br />A-6 <br />Elevations <br />3/7/06 <br />A-7 <br />Elevations <br />3/7/06 <br />A-8 <br />Roof Plan <br />2/6/06 <br />A-9 <br />Reflected Ceiling Plan <br />3/9/06 <br />A-10 <br />Sections and Details <br />3/7/06 <br />A-11 <br />Sections and Details <br />3/7/06 <br />A-12 <br />Schedules <br />3/1/06 <br />A-13 <br />Interior Elevations and Details <br />3/7/06 <br />A-14 <br />Details <br />3/6/06 <br />A-15 <br />Details <br />3/1/06 <br />A-16 <br />Details <br />2/6/06 <br />I-1 <br />Interiors Plan <br />3/8/06 <br />S-1 <br />Foundation Plan and Details <br />3/1/06 <br />S-2 <br />Roof Framing Plan and Details <br />3/1/06 <br />S-3 <br />Structural Notes and Details <br />2/6/06 <br />M-1 <br />Mechanical Plan - HVAC <br />3/9/06 <br />M-2 <br />Mechanical Equipment Schedule and Details <br />3/9/06 <br />M-3 <br />Kitchen Hood Schedule and Details <br />9/29/05 <br />E01 <br />Electrical Site Plan — Lighting <br />3/9/06 <br />E02 <br />Electrical Site Plan - Photometrics <br />9/29/05 <br />E-1 <br />Electrical Symbol Legend, Schedule and Notes <br />3/9/06 <br />E-2 <br />Electrical Floor Plan - Lighting <br />3/15/06 <br />E-3 <br />Electrical Floor Plan — Power and Systems <br />3/15/06 <br />E-4 <br />Electrical One Line and Rise Diagram <br />3/15/06 <br />P-1 <br />Plumbing Floor Plan — Plumbing <br />2/28/06 <br />P-2 <br />Sanitary and Domestic Water Riser Diagrams <br />2/28/06 <br />P-3 <br />Schedules and Details - Plumbing <br />2/28/06 <br />25 <br />