My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-167
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2016 5:01:24 PM
Creation date
9/30/2015 9:43:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/16/2006
Control Number
2006-167
Agenda Item Number
14.A.2.
Entity Name
Donadio & Associates
Subject
Part II Agreement Review-IRC Fire Station No. 4
Project Number
#5018.001.4.1.2
Supplemental fields
SmeadsoftID
5636
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 1.3.3 If the Design/Builder defaults in the Design/Builder's obligations to the Owner, <br />the Architect shall grant a license to the Owner to use the drawings, specifications, and <br />other documents and electronic data furnished by the Architect to the Design/Builder for <br />the completion of the Project, conditioned upon the Owner's execution of an agreement <br />to cure the Design/Builder's default in payment to the Architect for services previously <br />performed and to the extent allowed by law, indemnify the Architect with regard to <br />claims arising from such reuse without the Architect's professional involvement. <br />§ 1.3.4 Submission or distribution of the Design/Builder's documents to meet official <br />regulatory requirements or for similar purposes in connection with the Project is not to <br />be construed as publication in derogation of the rights reserved in Section 1.3.1. <br />ARTICLE 2 OWNER <br />§ 2.1 The Owner shall designate a representative authorized to act on the Owner's <br />behalf with respect to the Project. The Owner or such authorized representative shall <br />examine documents submitted by the Design/Builder and shall render decisions in a <br />timely manner and in accordance with the schedule accepted by the Owner. The Owner <br />may obtain independent review of the Contract Documents by a separate architect, <br />engineer, contractor or cost estimator under contract to or employed by the Owner. <br />Such independent review shall be undertaken at the Owner's expense in a timely <br />manner and shall not delay the orderly progress of the Work. <br />§ <br />2.2 The Owner may appoint an on-site <br />project <br />representative to observe <br />the Work and <br />to <br />have such other responsibilities as the <br />Owner <br />and Design/Builder agree <br />in writing. <br />§ 2.3 The Owner shall cooperate with the Design/Builder in securing building and other <br />permits, licenses and inspections. The Owner shall not be required to pay the fees for <br />such permits, licenses and inspections unless the cost of such fees is excluded from the <br />Design/Builder's Proposal. <br />§ 2.4 The Design/Builder 9waer shall furnish services of land surveyors, geotechnical <br />engineers and other consultants for subsoil, air and water conditions, in addition to <br />those provided under the Part 1 Agreement, when such services are deemed necessary <br />by the Design/Builder to properly carry out the design services required by this Part 2 <br />Agreement. <br />§ 2.5 The Owner shall disclose, to the extent known to the Owner, the results and <br />reports of prior tests, inspections or investigations conducted for the Project involving: <br />structural or mechanical systems; chemical, air and water pollution; hazardous <br />materials; or other environmental and subsurface conditions. The Owner shall disclose <br />all information known to the Owner regarding the presence of pollutants at the Project's <br />site. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.