My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-167
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2016 5:01:24 PM
Creation date
9/30/2015 9:43:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/16/2006
Control Number
2006-167
Agenda Item Number
14.A.2.
Entity Name
Donadio & Associates
Subject
Part II Agreement Review-IRC Fire Station No. 4
Project Number
#5018.001.4.1.2
Supplemental fields
SmeadsoftID
5636
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 3.2.3 The Design/Builder shall submit Construction Documents for review and <br />approval by the Owner. Construction Documents may include drawings, specifications, <br />and other documents and electronic data setting forth in detail the requirements for <br />construction of the Work, and shall: <br />.1 be consistent with the intent of the Design/Builder's Proposal; <br />.2 provide information for the use of those in the building trades; and <br />.3 include documents customarily required for regulatory agency approvals. <br />§ 3.2 4 The Design/Builder, with the assistance of the Owner, shall file documents <br />required to obtain necessary approvals of governmental authorities having jurisdiction <br />over the Project. <br />§ 3.2.5 Unless otherwise provided in the Contract Documents, the Design/Builder shall <br />provide or cause to be provided and shall pay for design services, labor, materials, <br />equipment, tools, construction equipment and machinery, water, heat, utilities, <br />transportation and other facilities and services necessary for proper execution and <br />completion of the Work, whether temporary or permanent and whether or not <br />incorporated or to be incorporated in the Work. <br />§ 3.2.6 The Design/Builder shall be responsible for all construction means, methods, <br />techniques, sequences and procedures, and for coordinating all portions of the Work <br />under this Part 2 Agreement. <br />§ 3.2.7 The Design/Builder shall keep the Owner informed of the progress and quality of <br />the Work. <br />§ 3.2.8 The Design/Builder shall be responsible for correcting Work which does not <br />conform to the Contract Documents. <br />§ 3.2.9 The Design/Builder warrants to the Owner that materials and equipment <br />furnished under the Contract will be of good quality and new unless otherwise required <br />or permitted by the Contract Documents, that the construction will be free from faults <br />and defects, and that the construction will conform with the requirements of the Contract <br />Documents. Construction not conforming to these requirements, including substitutions <br />not properly approved by the Owner, shall be corrected in accordance with Article 9. <br />§ 3.2.10 The Design/Builder shall pay all sales, consumer, use and similar taxes which <br />had been legally enacted at the time the Design/Builder's Proposal was first submitted <br />to the Owner, and shall secure and pay for building and other permits and governmental <br />fees, licenses and inspections necessary for the proper execution and completion of the <br />Work which are either customarily secured after execution of a contract for construction <br />or are legally required at the time the Design/Builder's Proposal was first submitted to <br />the Owner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.