My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-168
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 11:58:31 AM
Creation date
9/30/2015 9:43:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/16/2006
Control Number
2006-168
Agenda Item Number
14.A.3.
Entity Name
Donadio & Associates, Architects, P.A.
Subject
Construction documents for Fire station #5
Project Number
5018.001.05.1.2
Supplemental fields
SmeadsoftID
5637
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 3 .2.3 The Design/Builder shall submit Construction Documents for review and <br /> approval by the Owner. Construction Documents may include drawings , specifications , <br /> and other documents and electronic data setting forth in detail the requirements for <br /> construction of the Work, and shall : <br /> A be consistent with the intent of the Design/Builder's Proposal ; <br /> .2 provide information for the use of those in the building trades ; and <br /> .3 include documents customarily required for regulatory agency approvals . <br /> § 3 .2 4 The Design/Builder, with the assistance of the Owner, shall file documents <br /> required to obtain necessary approvals of governmental authorities having jurisdiction <br /> over the Project. <br /> § 3 .2 .5 Unless otherwise provided in the Contract Documents , the Design/Builder shall <br /> provide or cause to be provided and shall pay for design services , labor, materials , <br /> equipment, tools , construction equipment and machinery , water, heat, utilities , <br /> transportation and other facilities and services necessary for proper execution and <br /> completion of the Work, whether temporary or permanent and whether or not <br /> incorporated or to be incorporated in the Work . <br /> § 3 .2 .6 The Design/Builder shall be responsible for all construction means , methods , <br /> techniques , sequences and procedures , and for coordinating all portions of the Work <br /> under this Part 2 Agreement. <br /> § 3 .2 .7 The Design/Builder shall keep the Owner informed of the progress and quality of <br /> the Work . <br /> § 3 .2.8 The Design/Builder shall be responsible for correcting Work which does not <br /> conform to the Contract Documents . <br /> § 3 .2.9 The Design/Builder warrants to the Owner that materials and equipment <br /> furnished under the Contract will be of good quality and new unless otherwise required <br /> or permitted by the Contract Documents , that the construction will be free from faults <br /> and defects , and that the construction will conform with the requirements of the Contract <br /> Documents . Construction not conforming to these requirements , including substitutions <br /> not properly approved by the Owner, shall be corrected in accordance with Article 9 . <br /> § 3.2. 10 The Design/Builder shall pay all sales , consumer, use and similar taxes which <br /> had been legally enacted at the time the Design/Builder's Proposal was first submitted <br /> to the Owner, and shall secure and pay for building and other permits and governmental <br /> fees , licenses and inspections necessary for the proper execution and completion of the <br /> Work which are either customarily secured after execution of a contract for construction <br /> or are legally required at the time the Design/Builder's Proposal was first submitted to <br /> the Owner. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.