Laserfiche WebLink
.. 85 <br /> Main Library <br /> Support services located separately from a library : <br /> Cost does not include monthly lease space cost . <br /> • Renovate , interior finish-out — new lease space <br /> 2 , 600 SF x $75 . 00/SF = $ 195 , 000 <br /> • Soft costs <br /> r. 10 % of construction cost = $ 19 , 500 <br /> • Furniture <br /> 2 , 600 SF x $ 18 . 00/SF = $ 469800 <br /> • Technology <br /> 2 , 600 SF x $ 5 . 00/SF = $ 139000 <br /> " TOTAL = $ 2749300 <br /> Renovate Main Library after support services move : <br /> • Renovate, interior finish-out cost — existing library <br /> 2 , 600 SF x $75 . 00/SF = $ 195 ,000 <br /> r. <br /> • Soft costs <br /> 10% of construction cost = $ 19 , 500 <br /> • Furniture <br /> 27600 SF x $ 18 . 00/SF = $ 469800 <br /> • Technology <br /> 2 , 600 SF x $ 5 . 00/SF = $ 139000 <br /> TOTAL = $ 274 , 300 <br /> North IRC Branch <br /> Cost does not include new land cost or allow for sale of existing facility . <br /> • Building / site construction cost <br /> 35 ,000 SF x $ 150 . 00/SF = $592503000 <br /> • Soft costs <br /> 10 % of construction cost = $ 525 ,000 <br /> • Furniture <br /> 35 ,000 SF x $ 18 . 00/SF = $ 6309000 <br /> • Technology <br /> ■. 355000 SF x $5 . 00/SF = $ 1759000 <br /> • Collection (Use existing plus <br /> popular libraries to open * ) <br /> TOTAL = $6 , 5809000 <br /> If popular libraries are not used, new materials will be needed for this sized library. <br /> Indian River County Library Master Facilities Plan 2005 - 2025 <br /> .rr <br />