Laserfiche WebLink
ITEMIZED BID SCHEDULE REVISED 9122108 <br />PROJECT NAME: PAVING AND DRAINAGE IMPROVEMENTS TO <br />17th LANE S.W. FROM 27th AVENUE TO EAST APPROX. 900' <br />20th AVENUE S.W. FROM 21st STREET S.W. TO 17th LANE S.W. <br />17TH LANE S.W. FROM FALCON TRACE PROJECT ENTRANCE TO 20th AVENUE <br />IRC PROJECT #0803 <br />BIDDER'S NAME J.W.Cheatham, LLC <br />LS = Lump Sum LF = Linear Foot EA = Each SY = Square Yard TN = Ton AS = Assembly CY = Cubic Yard <br />310-8 <br />0803 Itemized Bid Schedule REVISION 09-22-08 <br />Fx ��•� a� <br />3vlC`'� �.c < ,ffd� �x <br />�� <br />777 <br />tP.twJ <br />„��, +� <br />Md;., �si .<. U . .k. <br />20th AVENUE SW AND 17th LANE (BY ARCADIS) <br />ROADWAY MATERIALS Cont) <br />575-1-1 <br />SODDING BAHIA <br />SY <br />14784 <br />1.40 <br />20,697.60 <br />575-1-2 <br />SODDING FLORATAM <br />SY <br />3,000 <br />3.00 <br />93000.00 <br />1643-700 <br />VALVE BOX, ADJUST <br />EA <br />4 <br />247.00 <br />988.00 <br />TRAFFIC SIGNING AND MARKINGS <br />700-40-1 <br />SIGN, SINGLE POST <br />AS <br />13 <br />222.00 <br />2,886.00 <br />700-46-21 <br />SIGN SINGLE POST RELOCATE <br />AS <br />8 <br />113.00 <br />904.00 <br />706-3 <br />RETRO -REFLECTIVE PAVEMENT MARKER <br />EA <br />454 <br />4.40 <br />11997.60 <br />711-11-121 <br />6" SOLID WHITE THERMOPLASTIC <br />LF <br />15,256 <br />0.60 <br />91153.60 <br />711-11-123 <br />12" SOLID WHITE THERMOPLASTIC <br />LF <br />70 <br />1.80 <br />126.00 <br />711-11-125 <br />24" SOLID WHITE THERMOPLASTIC STOP BARS <br />LF <br />373 <br />3.00 <br />1,119.00 <br />711-11-131 <br />6" SKIP WHITE 6'-10' THERMOPLASTIC <br />LF <br />992 <br />0.80 <br />793.60 <br />711-11-170 <br />SOLID TRAFFIC ARROW WHITE THERMOPLATIC <br />EA <br />21 <br />52.00 <br />1,092.00 <br />711-11-211 <br />6" SOLID YELLOW THERMOPLASTIC <br />LF <br />15,453.0 <br />0.60 <br />91271.80 <br />711-11-214 <br />18" SOLID YELLOW THERMOPLASTIC <br />LF <br />957 <br />2.40 <br />2,296.80 <br />20TH AVENUE SW ROADWAY IMPROVEMENTS <br />SUB TOTAL <br />943,521.80 <br />LS = Lump Sum LF = Linear Foot EA = Each SY = Square Yard TN = Ton AS = Assembly CY = Cubic Yard <br />310-8 <br />0803 Itemized Bid Schedule REVISION 09-22-08 <br />