My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-342
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 1:25:14 PM
Creation date
10/1/2015 12:44:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/21/2008
Control Number
2008-342
Agenda Item Number
8.M.
Entity Name
J.W. Cheatham LLC
Subject
Falcon Trace Project Entrance
Area
17th Lane SW-27th Ave.,21st.St.SW-17th LaneSW
Project Number
0803, 0837, 0838
Bid Number
2008073
Supplemental fields
SmeadsoftID
7654
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 = Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter <br />called OWNER) <br />and <br />J.W. Cheatham, LLC <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The work is generally described as follows: <br />ARTICLE 2 = THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or <br />only a part is generally described as follows: <br />County Project Numbers: <br />Pr ect Address: L 17U <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER 9s representative, assume all duties and responsibilities, and <br />have the rights and authority assigned to ENGINEER in the Contract Documents in <br />connection with the completion of the Work in accordance with the Contract <br />Documents, <br />ARTICLE 4 = CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and <br />readiness for final payment as stated in the Contract Documents are of the essence of <br />the Contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.