My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-342A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-342A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2016 10:01:04 AM
Creation date
10/1/2015 12:45:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/21/2008
Control Number
2008-342A
Agenda Item Number
8.M.
Entity Name
J.W. Cheatham
Subject
Falcon Trace Subdivision
Area
17th Lane SW
Project Number
0803, 0837, 0838
Bid Number
2008073
Supplemental fields
SmeadsoftID
7655
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equal to the time lost due to such delay shall be <br /> CONTRACTOR's sole and exclusive remedy for such 13 . 03 Tests and Inspections <br /> delay. <br /> A. CONTRACTOR shall give ENGINEER timely <br /> 12 . 06 Delay Damages notice of readiness of the Work for all required <br /> inspections , tests , or approvals and shall cooperate <br /> A. In no event shall OWNER or ENGINEER be with inspection and testing personnel to facilitate <br /> liable to CONTRACTOR, any Subcontractor, any required inspections or tests . <br /> Supplier, or any other person or organization , or to any <br /> surety for or employee or agent of any of them , for B . iwa <br /> damages arising out of or resulting from : services of an independent testing ' <br /> 0"*T <br /> o <br /> perform all inspections , tests, or approvy <br /> 1 . delays caused by or within the control the Contract Documents except: <br /> of CONTRACTOR ; or <br /> 1 . for inspections , to or approvals <br /> 2 . delays beyond the control of both covered by paragraphs 1 3 . 0 and 13 . 03 . D <br /> OWNER and CONTRACTOR including but not below; <br /> limited to fires , floods , epidemics , abnormal <br /> weather conditions , acts of God , or acts or 2 . that co incurred in connection with <br /> neglect by utility owners or other contractors tests or insp ions conducted pursuant to <br /> performing other work as contemplated by paragraph . 04 . 6 shall be paid as provided in <br /> Article 7 . said par raph 13 . 04 . 13 ; and <br /> B . Nothing in this paragraph 12 . 06 bars a as otherwise specifically provided in <br /> change in Contract Price pursuant to this Article 12 to <br /> compensate CONTRACTOR due to delay, <br /> interference , or disruption directly attributable to C . If Laws or Regulations of any public body <br /> actions or inactions of OWNER or anyone for whom having jurisdiction require any Work (or part thereof) <br /> OWNER is responsible. specifically to be inspected , tested , or approved by an <br /> employee or other representative of such public body, <br /> CONTRACTOR shall assume full responsibility for <br /> ARTICLE 13 - TESTS AND INSPECTIONS ; arranging and obtaining such inspections , tests , or <br /> CORRECTION , REMOVAL OR ACCEPTANCE OF approvals, pay all costs in connection therewith , and <br /> DEFECTIVE WORK furnish ENGINEER the required certificates of inspec- <br /> tion or approval . <br /> 13 . 01 Notice of Defects D . CONTRACTOR shall be responsible for <br /> arranging and obtaining and shall pay all costs in <br /> A. Prompt notice of all defective Work of which connection with any inspections, tests , or approvals <br /> OWNER or ENGINEER has actual knowledge will be required for OWNER' s and ENGINEER's acceptance <br /> given to CONTRACTOR . All defective Work may be of materials or equipment to be incorporated in the <br /> rejected , corrected , or accepted as provided in this Work; or acceptance of materials , mix designs <br />, or <br /> Article 13 . equipment submitted for approval prior to <br /> CONTRACTOR's purchase thereof for incorporation <br /> 13 . 02 Access to Work in the Work . Such inspections , tests , or approvals <br /> shall be performed by organizations acceptable to <br /> A. OWNER , ENGINEER , ENGINEER's Con- OWNER and ENGINEER. <br /> sultants , other representatives and personnel of <br /> OWNER , independent testing laboratories, and E . If any Work (or the work of others) that is to <br /> governmental agencies with jurisdictional interests will be inspected , tested , or approved is covered by CON - <br /> have access to the Site and the Work at reasonable TRACTOR without written concurrence of ENGI - <br /> times for their observation , inspecting , and testing . NEER, it must, if requested by ENGINEER , be uncov- <br /> CONTRACTOR shall provide them proper and safe ered for observation . <br /> conditions for such access and advise them of <br /> CONTRACTOR's Site safety procedures and F . Uncovering Work as provided in paragraph <br /> programs so that they may comply therewith as 13 . 03. E shall be at CONTRACTOR's expense unless <br /> applicable . CONTRACTOR has given ENGINEER timely notice <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 36 <br /> F \Engineering\Capital Projects\080317th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 Contract Documents\00700 - General <br /> Conditions REV <br /> 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.