My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-342A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-342A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2016 10:01:04 AM
Creation date
10/1/2015 12:45:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/21/2008
Control Number
2008-342A
Agenda Item Number
8.M.
Entity Name
J.W. Cheatham
Subject
Falcon Trace Subdivision
Area
17th Lane SW
Project Number
0803, 0837, 0838
Bid Number
2008073
Supplemental fields
SmeadsoftID
7655
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cause and without prejudice to any other right or to OWNER and ENGINEER , stop the Work until <br /> remedy of OWNER , elect to terminate the Contract. payment is made of all such amounts due <br /> In such case , CONTRACTOR shall be paid (without CONTRACTOR , including interest thereon . The <br /> duplication of any items) : provisions of this paragraph 15 . 04 are not intended to <br /> preclude CONTRACTOR from making a Claim under <br /> 1 . for completed and acceptable Work paragraph 10 . 05 for an adjustment in Contract Price <br /> executed in accordance with the Contract or Contract Times or otherwise for expenses or <br /> Documents prior to the effective date of damage directly attributable to CONTRACTOR's <br /> termination , including fair and reasonable sums stopping the Work as permitted by this paragraph . <br /> for overhead and profit on such Work; <br /> 2 . for expenses sustained prior to the ARTICLE 16 - DISPUTE RESOLUTION <br /> effective date of termination in performing <br /> services and furnishing labor, materials , or <br /> equipment as required by the Contract 16 . 01 Methods and Procedures <br /> Documents in connection with uncompleted <br /> Work , plus fair and reasonable sums for A. Dispute resolution methods and procedures , if <br /> overhead and profit on such expenses ; any, shall be as set forth in the Supplementary <br /> Conditions . If no method and procedure has been set <br /> 3 . for all claims, costs , losses , and forth , and subject to the provisions of paragraphs 9 . 09 <br /> damages ( including but not limited to all fees and 10 . 05 , OWNER and CONTRACTOR may <br /> and charges of engineers, architects, attorneys , exercise such rights or remedies as either may <br /> and other professionals and all court or otherwise have under the Contract Documents or by <br /> arbitration or other dispute resolution costs) in- Laws or Regulations in respect of any dispute . <br /> curred in settlement of terminated contracts <br /> with Subcontractors , Suppliers, and others; and <br /> ARTICLE 17 - MISCELLANEOUS <br /> 4 . for reasonable expenses directly <br /> attributable to termination . <br /> 17 . 01 Giving Notice <br /> B . CONTRACTOR shall not be paid on account <br /> of loss of anticipated profits or revenue or other eco- A. Whenever any provision of the Contract <br /> nomic loss arising out of or resulting from such Documents requires the giving of written notice , it will <br /> termination . be deemed to have been validly given if delivered in <br /> person to the individual or to a member of the firm or <br /> 15 . 04 CONTRACTOR May Stop Work or to an officer of the corporation for whom it is intended , <br /> Terminate or if delivered at or sent by registered or certified mail , <br /> postage prepaid , to the last business address known <br /> A. If, through no act or fault of CONTRACTOR , to the giver of the notice. <br /> the Work is suspended for more than 90 consecutive <br /> days by OWNER or under an order of court or other 17 . 02 Computation of Times <br /> public authority, or ENGINEER fails to act on any <br /> Application for Payment within 30 days after it is A. When any period of time is referred to in <br /> the <br /> submitted , Contract Documents by days, it will be computed to <br /> TRIAIGTOR any sum finally deteFmiRed to be , then exclude the first and include the last day of <br /> such <br /> CONTRACTOR may, upon seven days written notice period . If the last day of any such period falls on a <br /> to OWNER and ENGINEER , and provided OWNER Saturday or Sunday or on a day made a legal holiday <br /> or ENGINEER do not remedy such suspension or by the law of the applicable jurisdiction , such day will <br /> failure within that time , terminate the Contract and be omitted from the computation . <br /> recover from OWNER payment on the same terms as <br /> provided in paragraph 15 . 03 . In lieu of terminating the 17 . 03 Cumulative Remedies <br /> Contract and without prejudice to any other right or <br /> remedy, if ENGINEER has failed to act on an A. The duties and obligations imposed by these <br /> Application for Payment within 30 days after it is General Conditions and the rights and remedies avail- <br /> submitted , 9F OWNER has failed fGF 30 days te pay able hereunder to the parties hereto are in addition to , <br /> GONTRAGTOR any sum finally deteFFAined49-be-due, and are not to be construed in any way as a limitation <br /> CONTRACTOR may , seven days after written notice of, any rights and remedies available to any or all of <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 45 <br /> F:\Engineering\Capital Projects\0803 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 Contract Documents\00700 - General <br /> Conditions REV <br /> 04-07.doc <br />