Laserfiche WebLink
SECTION 00800 - SUPPLEMENTARY CONDITIONS TO THE <br />GENERAL CONDITIONS <br />SC -1.00 Introduction <br />These Supplementary Conditions amend or supplement the Standard General Conditions of the <br />Construction Contract (No. 1910-8, 1996 Edition) and other provisions of the Contract <br />Documents as indicated below. All provisions, which are not so amended or supplemented, <br />remain in full force and effect. <br />The terms used in these Supplementary Conditions will have the meanings indicated in the <br />General Conditions. <br />SC -1.01 Defined Terms <br />SC -1.01.A.20. Delete paragraph GC 1.01.A.20 in its entirety. <br />SC -2.05 Before Starting Construction <br />SC -2.05.C. Delete paragraph GC 2.05.0 in its entirety and insert the following paragraph in its <br />place: <br />C. Evidence of Insurance: CONTRACTOR shall not commence work under this <br />Contract until he has obtained all insurance required under Article 5 and such <br />insurance has been delivered to the OWNER and approved by the OWNER, nor <br />shall the CONTRACTOR allow any Subcontractor to commence work on his <br />subcontract until all similar insurance required of the Subcontractor has been so <br />obtained and approved. All such insurance shall remain in effect until final <br />payment and at all times thereafter when CONTRACTOR may be correcting, <br />removing or replacing defective Work in accordance with Article 13. <br />SC -2.06 Preconstruction Conference <br />SC -2.06 Delete paragraph GC -2.06.A in its entirety and insert the following paragraph in its <br />place: <br />A. Immediately after awarding the contract, but before the CONTRACTOR begins <br />work, the Engineer will call a preconstruction conference at a place the <br />ENGINEER designates to establish an understanding among the parties as to <br />the work and to discuss schedules referred to in paragraph 2.05.6, procedures <br />for handling Shop Drawings and other submittals, and maintaining required <br />records. Utility companies and others as appropriate will be requested to attend <br />to dis cuss and coordinate work. <br />SC -3.06 Coordination of Plans, Specifications, and Special Provisions <br />SC -3.06 Add the following new paragraphs immediately after paragraph GC -3.05: <br />SC -3.06 Coordination of Plans, Specifications, and Special Provisions <br />A. In case of discrepancy, the governing order of the documents shall be as follows: <br />1. Written Interpretations <br />2, Addenda <br />3. Specifications <br />4. Supplementary Conditions to the General Conditions <br />5. General Conditions <br />6. Approved Shop Drawings <br />7. Drawings <br />8. Referenced Standards. <br />00800-1 <br />00800 - Supplementary Conditions REV 04-07 <br />008001 F:\Engineering\Capital Projects\0803 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 Contract Documents\00800 - <br />Supplementary Conditions REV 04-07.doc <br />