My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-342B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-342B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2016 10:03:24 AM
Creation date
10/1/2015 12:45:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/21/2008
Control Number
2008-342B
Agenda Item Number
8.M.
Entity Name
J.W. Cheatham
Subject
Falcon Trace Subdivision
Area
17th Lane SW
Project Number
0803,0837,0838
Bid Number
2008073
Supplemental fields
SmeadsoftID
7656
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01340 - Submittal of Shop Drawings <br /> M . Upon return of a submittal marked " Revise and Resubmit" , make the <br /> corrections indicated and repeat the initial approval procedure . The " Not <br /> Approved " notation is used to indicate material or equipment that is not <br /> acceptable . Upon return of a submittal so marked , repeat the initial <br /> approval procedure utilizing acceptable material or equipment . <br /> N . Any related Work performed or equipment installed without an "Approved " <br /> or "Approved as Corrected " Shop Drawing will be at the sole responsibility <br /> of the CONTRACTOR . <br /> O . Submit Sop Drawings well in advance of the need for the material or <br /> equipment for construction and with ample allowance for the time required <br /> to make delivery of material or equipment after data covering such is <br /> approved . CONTRACTOR shall assume the risk for all materials or <br /> equipment which is fabricated or delivered prior to the approval of Shop <br /> Drawings . Materials or equipment will not be included in periodic progress <br /> payments until approval thereof has been obtained in the specified <br /> manner. <br /> P . ENGINEER will review and process all submittals promptly , but a <br /> reasonable time should be allowed for this , for the Shop Drawings being <br /> revised and resubmitted , and for time required to return the approved <br /> Shop Drawings to CONTRACTOR . <br /> Q . Furnish required submittals with complete information and accuracy in <br /> order to achieve required approval of an item within three submittals . All <br /> costs to ENGINEER involved with subsequent submittals of Shop <br /> Drawings , Samples or other items requiring approval , will be back- charged <br /> to CONTRACTOR in accordance with the General Conditions and the <br /> Supplementary Conditions . If the CONTRACTOR requests a substitution <br /> for a previously approved item , all of ENGINEER' S costs in the reviewing <br /> and approval of the substitution will be back-charged to CONTRACTOR <br /> unless the need for such substitution is beyond the control of <br /> CONTRACTOR . <br /> + + END OF SECTION + + <br /> 01340 - Submittal of Shop Drawings <br /> 01340-6 <br /> F:\Engineering\Capital Projects\0803 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 Contract <br /> Documents\01340 - Submittal of Shop Drawings. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.