Laserfiche WebLink
2. Indian River Farms Water Control District <br />C. The CONTRACTOR shall obtain and pay for all other required permits and <br />licenses. The CONTRACTOR shall provide copies of the permits to the <br />OWNER and ENGINEER and shall comply with all conditions contained in <br />the permits at no extra cost to the OWNER. <br />D. The CONTRACTOR shall be familiar with all permit requirements during <br />construction and shall be responsible for complying with these <br />requirements. The cost of this effort shall be included in the pay item in <br />which the work is most closely associated with. <br />SC -6.10 Taxes <br />SC -6.10.A Delete paragraph GC -6.10.A in its entirety and insert the following in its place: <br />OWNER qualifies for state and local sales tax exemption in the purchase of all material and <br />equipment <br />SC -13.03 Test and Inspections <br />SC -13.03.B. Delete the first sentence of paragraph GC -13.03.8 in its entirety, and insert the <br />following sentences in its place: <br />B. OWNER shall employ and pay for the services of an independent testing laboratory to <br />perform all initial inspections, tests, or approvals required by the Contract Documents <br />except those inspections, tests, or approvals listed immediately below. Subsequent <br />inspections, tests, or approvals required after initial failing inspections, tests, or <br />approvals shall be paid for by the CONTRACTOR by backcharge to subsequent <br />applications for payment. The CONTRACTOR shall arrange, obtain, and pay for the <br />following inspections, tests, or approvals: <br />1. inspections, tests, or approvals covered by paragraphs 13.03.0 and 13.03.D <br />below; <br />2, costs incurred in connection with tests or inspections conducted pursuant to <br />paragraph 13.04.6 shall be paid as provided in said paragraph 13.04.B; <br />3, tests otherwise specifically provided in the Contract Documents. <br />13.05 OWNER May Stop the Work <br />SC -13.05.A. Delete paragraph GC43.05.A in its entirety and insert the following paragraph in its <br />place: <br />A. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled <br />workers or suitable materials or equipment, or fails to comply with permit <br />requirements, or fails to comply with the technical specifications, or fails to <br />perform the Work in such a way that the completed Work will conform to the <br />Contract Documents, OWNER may order CONTRACTOR to stop the Work, or any <br />portion thereof, until the cause for such order has been eliminated; however, this <br />right of OWNER to stop the Work shall not give rise to any duty on the part of <br />OWNER to exercise this right for the benefit of CONTRACTOR, any <br />00800-6 <br />00800 - Supplementary Conditions REV 04-07 <br />00800 6F:\Engineering\Capital Projects\0803 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 Contract Documents\00800 - <br />Supplementary Conditions REV 04-07.doc <br />