My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-342D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-342D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2016 10:07:31 AM
Creation date
10/1/2015 12:45:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/21/2008
Control Number
2008-342D
Agenda Item Number
8.M.
Entity Name
J.W. Cheatham
Subject
Falcon Trace Subdivision
Area
17th Lane SW
Project Number
0803, 0837, 0838
Bid Number
2008073
Supplemental fields
SmeadsoftID
7657
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . 3 GENERAL <br /> A. Do not begin any other construction work until the pollution control and <br /> treatment system has been constructed in accordance with approved plans and <br /> approved for use by the OWNER and applicable permitting authorities . <br /> Be From time to time , the OWNER or ENGINEER will inspect the pollution control <br /> and treatment system and may take effluent samples for analysis by a testing <br /> laboratory selected and paid for by the OWNER . If at anytime , the OWNER or <br /> ENGINEER determines that the pollution control and treatment system is not in <br /> compliance with the approved system , the OWNER or ENGINEER will shut the <br /> portion of the project down that is not in compliance , and it shall remain shut- <br /> down until the pollution control and treatment system is properly constructed or <br /> repaired , and complies with the approved pollution control and treatment <br /> system plans and specifications . <br /> C . Schedule construction to minimize erosion and stormwater runoff from the <br /> construction site . Implement erosion control measures on disturbed areas as <br /> soon as practicable in portions of the site where construction activities have <br /> temporarily or permanently ceased , but in no case more than 7 days after the <br /> construction activity in that portion of the site has temporarily or permanently <br /> ceased . <br /> D . Inspect each pollution control system at least once per day . Clean and <br /> maintain each pollution control system as required by its manufacturer or the <br /> OWNER , until the system is no longer needed . If a water quality violation <br /> occurs , immediately cease all work contributing to the water quality violation and <br /> correct the problem . <br /> E . Discharge shall not violate State or local water quality standards in the receiving <br /> waters , nor cause injury to the public health or to public or private property , nor <br /> to the Work completed or in progress . The receiving point for water from <br /> construction operations shall be approved by the applicable regulatory agency <br /> and the ENGINEER . <br /> F . Promptly repair all damage at no cost to the OWNER . <br /> 1A SUBMITTALS <br /> A . Shop Drawings : Submit shop drawings of the proposed pollution control and <br /> treatment systems in accordance with Article 6 . 17 of the General Conditions . <br /> Be Stormwater Pollution Prevention Plan . <br /> 01025-5 Technical Specifications <br /> F :\Engineering\Capital Projects\0803 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 <br /> Contract Documents\Technical Specifications .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.