Laserfiche WebLink
PART 3 - EXECUTION <br /> A . Design , construct , and maintain the pollution control and treatment system to <br /> minimize erosion and capture and remove pollutants from the construction site <br /> and from all other areas disturbed by construction activities . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 104 - Erosion and Water Pollution - Lump Sum <br /> (The rest of this page intentionally left blank) <br /> 01025- 10 Technical Specifications <br /> FAEngineering\Capital Projects\0803 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 <br /> Contract Documents\Technical Specifications .doc <br />