My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-342D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-342D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2016 10:07:31 AM
Creation date
10/1/2015 12:45:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/21/2008
Control Number
2008-342D
Agenda Item Number
8.M.
Entity Name
J.W. Cheatham
Subject
Falcon Trace Subdivision
Area
17th Lane SW
Project Number
0803, 0837, 0838
Bid Number
2008073
Supplemental fields
SmeadsoftID
7657
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction and maintenance of any necessary detour facilities ; the providing of <br /> necessary facilities for access to residences , businesses , etc . , along the project ; the <br /> furnishing , installing and maintaining of traffic control and safety devices during <br /> construction , the control of dust through the use of calcium chloride if necessary , and <br /> any other special requirements for safe and expeditious movement of traffic as may be <br /> called for on the plans . The term , Maintenance of Traffic , as used herein , shall include <br /> all of such facilities , devices and operations as are required for the safety and <br /> convenience of the public as well as for minimizing public nuisance ; all as specified in <br /> this Itemized Section 14 of these provisions and Paragraph 24 in General Conditions <br /> Section . <br /> B . BEGINNING DATE OF CONTRACTOR' S RESPONSIBILITY : The Contractor shall <br /> present his Maintenance of Traffic Plan at the pre-construction conference . The <br /> Maintenance of Traffic Plan shall indicate the type and location of all signs , lights , <br /> barricades , striping and barriers to be used for the safe passage of pedestrians and <br /> vehicular traffic through the project and for the protection of the workmen . The plan <br /> will indicate conditions and setups for each phase of the Contractor' s activities . <br /> When the project plans include or specify a specific Maintenance of Traffic Plan , <br /> alternate proposals will be considered when they are found to be equal to or better <br /> than the plan specified . <br /> In no case may the Contractor begin work until the Maintenance of Traffic Plan has <br /> been approved in writing by the Engineer. Modifications to the Maintenance of Traffic <br /> Plan that become necessary shall also be approved in writing . Except in an <br /> emergency , no changes to the approved plan will be allowed until approval to change <br /> such plan has been received . <br /> The cost of all work included in the Maintenance of Traffic Plan shall be included in the <br /> pay item for Maintenance of Traffic . <br /> The Contractor shall be responsible for performing daily inspections , including <br /> weekends and holidays , with some inspections at nighttime , of the installations on the <br /> project and replace all equipment and devices not conforming with the approved <br /> standards during that inspection . The project personnel will be advised of the <br /> schedule of these inspections and be given the opportunity to join in the inspection as <br /> is deemed necessary . <br /> C . TRAFFIC CONTROL - STANDARDS : The 2002 FDOT Design Standards For Design , <br /> Construction Maintenance and Utility Operations On The State Highway System , set <br /> forth the basic principles and prescribes minimum standards to be followed in the <br /> design , application , installation , maintenance and removal of all traffic control devices <br /> and all warning devices and barriers which are necessary to protect the public and <br /> workmen from hazards within the project limits . The standards established in the <br /> aforementioned manual constitute the minimum requirements for normal conditions , <br /> and additional traffic control devices warning devices , barriers or other safety devices <br /> will be required where unusual , complex or particularly hazardous conditions exist . <br /> 01025-2 Technical Specifications <br /> F :\Engineering\Capital Projects\0803 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 <br /> Contract Documents\Technical Specifications .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.