construction and maintenance of any necessary detour facilities ; the providing of <br /> necessary facilities for access to residences , businesses , etc . , along the project ; the <br /> furnishing , installing and maintaining of traffic control and safety devices during <br /> construction , the control of dust through the use of calcium chloride if necessary , and <br /> any other special requirements for safe and expeditious movement of traffic as may be <br /> called for on the plans . The term , Maintenance of Traffic , as used herein , shall include <br /> all of such facilities , devices and operations as are required for the safety and <br /> convenience of the public as well as for minimizing public nuisance ; all as specified in <br /> this Itemized Section 14 of these provisions and Paragraph 24 in General Conditions <br /> Section . <br /> B . BEGINNING DATE OF CONTRACTOR' S RESPONSIBILITY : The Contractor shall <br /> present his Maintenance of Traffic Plan at the pre-construction conference . The <br /> Maintenance of Traffic Plan shall indicate the type and location of all signs , lights , <br /> barricades , striping and barriers to be used for the safe passage of pedestrians and <br /> vehicular traffic through the project and for the protection of the workmen . The plan <br /> will indicate conditions and setups for each phase of the Contractor' s activities . <br /> When the project plans include or specify a specific Maintenance of Traffic Plan , <br /> alternate proposals will be considered when they are found to be equal to or better <br /> than the plan specified . <br /> In no case may the Contractor begin work until the Maintenance of Traffic Plan has <br /> been approved in writing by the Engineer. Modifications to the Maintenance of Traffic <br /> Plan that become necessary shall also be approved in writing . Except in an <br /> emergency , no changes to the approved plan will be allowed until approval to change <br /> such plan has been received . <br /> The cost of all work included in the Maintenance of Traffic Plan shall be included in the <br /> pay item for Maintenance of Traffic . <br /> The Contractor shall be responsible for performing daily inspections , including <br /> weekends and holidays , with some inspections at nighttime , of the installations on the <br /> project and replace all equipment and devices not conforming with the approved <br /> standards during that inspection . The project personnel will be advised of the <br /> schedule of these inspections and be given the opportunity to join in the inspection as <br /> is deemed necessary . <br /> C . TRAFFIC CONTROL - STANDARDS : The 2002 FDOT Design Standards For Design , <br /> Construction Maintenance and Utility Operations On The State Highway System , set <br /> forth the basic principles and prescribes minimum standards to be followed in the <br /> design , application , installation , maintenance and removal of all traffic control devices <br /> and all warning devices and barriers which are necessary to protect the public and <br /> workmen from hazards within the project limits . The standards established in the <br /> aforementioned manual constitute the minimum requirements for normal conditions , <br /> and additional traffic control devices warning devices , barriers or other safety devices <br /> will be required where unusual , complex or particularly hazardous conditions exist . <br /> 01025-2 Technical Specifications <br /> F :\Engineering\Capital Projects\0803 17th Lane SW Roadway Improvements from 27th Ave to approx. 900 LF east of 27th Ave\0803 <br /> Contract Documents\Technical Specifications .doc <br />