Laserfiche WebLink
with respect to a Hazardous Environmental Condition at the Site , if any, and possible changes in <br /> the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at <br /> the Site which was not shown or indicated in the Drawings or Specifications or identified in the <br /> Contract Documents to be within the scope of the Work appear in paragraph 4. 06 of the General <br /> Conditions. <br /> 4 . 05 Upon a request directed to the ENGINEER (Michael D . Nixon , P . E. (772) 226- 1986) , <br /> OWNER will provide Bidder access to the Site to conduct such examinations, investigations, <br /> explorations , tests , and studies as Bidder deems necessary for submission of a Bid . Bidder shall <br /> fill all holes and clean up and restore the Site to its former condition upon completion of such <br /> explorations , investigations, tests, and studies . <br /> 4. 06 Reference is made to Article 7 of the Supplementary Conditions for the identification of <br /> any other work that is to be performed at the Site by OWNER or others (such as utilities and other <br /> prime contractors) that relates to the Work for which a Bid is to be submitted . On request, <br /> OWNER will provide to each Bidder for examination access to or copies of Contract Documents <br /> (other than portions thereof related to price) for such other work. <br /> 4. 07 It is the responsibility of each Bidder before submitting a Bid to : <br /> A. examine and carefully study the Bidding Documents, including any Addenda and the other <br /> related data identified in the Bidding Documents; <br /> B . VISIT THE SITE AFTER CONTACTING THE ENGINEER (MICHAEL D. NIXON , P. E., <br /> (772) 226-1986) TO MAKE ARRANGEMENTS IN ADVANCE, AND BECOME FAMILIAR WITH <br /> AND SATISFY BIDDER AS TO THE GENERAL, LOCAL, AND SITE CONDITIONS THAT MAY <br /> AFFECT COST, PROGRESS, AND PERFORMANCE OF THE WORK; <br /> C . become familiar with and satisfy Bidder as to all federal , state, and local Laws and <br /> Regulations that may affect cost, progress, or performance of the Work; <br /> D. carefully study all reports of explorations and tests of subsurface conditions at or <br /> contiguous to the Site and all drawings of physical conditions in or relating to existing surface or <br /> subsurface structures at or contiguous to the Site (except Underground Facilities) which have <br /> been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General <br /> Conditions, and carefully study all reports and drawings of a Hazardous Environmental Condition , <br /> if any, at the Site which have been identified in the Supplementary Conditions as provided in <br /> paragraph 4.06 of the General Conditions ; <br /> E. obtain and carefully study (or assume responsibility for doing so) all additional or <br /> supplementary examinations , investigations, explorations, tests , studies, and data concerning <br /> conditions (overhead , surface, subsurface, and Underground Facilities) at or contiguous to the <br /> Site which may affect cost, progress, or performance of the Work or which relate to any aspect of <br /> the means, methods, techniques , sequences , and procedures of construction to be employed by <br /> Bidder, including any specific means , methods, techniques, sequences, and procedures of <br /> construction expressly required by the Bidding Documents , and safety precautions and programs <br /> incident thereto; <br /> F . agree at the time of submitting its Bid that no further examinations , investigations, <br /> explorations, tests , studies , or data are necessary for the determination of its Bid for performance <br /> of the Work at the price bid and within the times and in accordance with the other terms and <br /> conditions of the Bidding Documents ; <br /> 00200 - Instructions to Bidders REV 04-07 <br /> 00200 - 3 <br /> F.\Engineering\Capital Projects\9920-16th St, 74th Ave to 66th Ave19920 Contrad Documents 8 Specs\00200 - Instructions to Biddem REV 04-D7.doc Rev. 05101 <br />