Laserfiche WebLink
2 . Cost of all materials and equipment in accordance with rental agreements approved <br /> furnished and incorporated in the Work, includ- by OWNER with the advice of ENGINEER, and <br /> ing costs of transportation and storage thereof, the costs of transportation , loading , unloading , <br /> and Suppliers' field services required in assembly, dismantling , and removal thereof. <br /> connection therewith . All cash discounts shall All such costs shall be in accordance with the <br /> accrue to CONTRACTOR unless OWNER terms of said rental agreements . The rental of <br /> deposits funds with CONTRACTOR with which any such equipment, machinery, or parts shall <br /> to make payments , in which case the cash cease when the use thereof is no longer <br /> discounts shall accrue to OWNER . All trade necessary for the Work. <br /> discounts, rebates and refunds and returns <br /> from sale of surplus materials and equipment d . Sales , consumer, use, and other <br /> shall accrue to OWNER , and CONTRACTOR similar taxes related to the Work, and for which <br /> shall make provisions so that they may be CONTRACTOR is liable, imposed by Laws and <br /> obtained . Regulations . <br /> 3 . Payments made by CONTRACTOR e . Deposits lost for causes other than <br /> to Subcontractors for Work performed by negligence of CONTRACTOR , any Sub- <br /> Subcontractors. If required by OWNER , CON- contractor, or anyone directly or indirectly <br /> TRACTOR shall obtain competitive bids from employed by any of them or for whose acts any <br /> subcontractors acceptable to OWNER and of them may be liable, and royalty payments <br /> CONTRACTOR and shall deliver such bids to and fees for permits and licenses. <br /> OWNER, who will then determine, with the <br /> advice of ENGINEER , which bids , if any, will be f. Losses and damages (and related <br /> acceptable . If any subcontract provides that the expenses) caused by damage to the Work, not <br /> Subcontractor is to be paid on the basis of Cost compensated by insurance or otherwise, sus- <br /> of the Work plus a fee , the Subcontractor's tained by CONTRACTOR in connection with <br /> Cost of the Work and fee shall be determined the performance of the Work (except losses <br /> in the same manner as CONTRACTOR's Cost and damages within the deductible amounts of <br /> of the Work and fee as provided in this para- property insurance established in accordance <br /> graph 11 . 01 . with paragraph 5. 06 . D) , provided such losses <br /> and damages have resulted from causes other <br /> 4 . Costs of special consultants than the negligence of CONTRACTOR , any <br /> (including but not limited to engineers , Subcontractor, or anyone directly or indirectly <br /> architects, testing laboratories , surveyors, employed by any of them or for whose acts any <br /> attorneys, and accountants) employed for of them may be liable. Such losses shall <br /> services specifically related to the Work. include settlements made with the written <br /> consent and approval of OWNER . No such <br /> 5 . Supplemental costs including the losses , damages , and expenses shall be <br /> following : included in the Cost of the Work for the <br /> purpose of determining CONTRACTOR's fee. <br /> a. The proportion of necessary trans- <br /> portation , travel , and subsistence expenses of g . The cost of utilities , fuel , and sanitary <br /> CONTRACTOR's employees incurred in dis- facilities at the Site. <br /> charge of duties connected with the Work. <br /> h . Minor expenses such as telegrams, <br /> b . Cost, including transportation and long distance telephone calls, telephone service <br /> maintenance, of all materials, supplies, equip- at the Site , expressage , and similar petty cash <br /> ment, machinery, appliances , office, and items in connection with the Work. <br /> temporary facilities at the Site , and hand tools <br /> not owned by the workers, which are consumed i. When the Cost of the Work is used to <br /> in the performance of the Work, and cost, less determine the value of a Change Order or of a <br /> market value, of such items used but not con- Claim , the cost of premiums for additional <br /> sumed which remain the property of CON- Bonds and insurance required because of the <br /> TRACTOR . changes in the Work or caused by the event <br /> giving rise to the Claim . <br /> C. Rentals of all construction equip- <br /> ment and machinery, and the parts thereof j . When all the Work is performed on the <br /> whether rented from CONTRACTOR or others basis of cost-plus , the costs of premiums for all <br /> 00700 - General Conditions <br /> 00700 - 32 <br /> F1Engineering\Capital Projects\0217-Powerline Road\Bid Documents\00700 - General Conditions.doc <br />