9. C)WNF=R shall--emplay and nasi f9F the
<br /> seFv*Ges of an independent testing labeFatgFy te B . If ENGINEER considers it necessary or
<br /> advisable that covered Work be observed by ENGI-
<br /> NEER or inspected or tested by others, CONTRAC-
<br /> TOR , at ENGINEER's request, shall uncover, expose,
<br /> or otherwise make available for observation , inspec-
<br /> oeveFed by paFagFaphs. 13 . 034 and 13 . 03 . D or testing as ENGINEER may require, that
<br /> belew; portion of the Work in question , furnishing all neces-
<br /> sary labor, material , and equipment. If it is found that
<br /> such Work is defective, CONTRACTOR shall pay all
<br /> Claims , costs , losses , and damages (including but not
<br /> paFagFaph 13 . 04 . 13 shall be paid as previded in limited to all fees and charges of engineers , architects ,
<br /> said paFagFaph 43 . 04 . 13 *; and attorneys, and other professionals and all court or
<br /> arbitration or other dispute resolution costs) arising out
<br /> of or relating to such uncovering , exposure , observa-
<br /> tion , inspection , and testing , and of satisfactory
<br /> replacement or reconstruction (including but not
<br /> C . If Laws or Regulations of any public body limited to all costs of repair or replacement of work
<br /> of
<br /> having jurisdiction require any Work (or part thereof) others) ; and OWNER shall be entitled to an
<br /> specifically to be inspected , tested , or approved by an appropriate decrease in the Contract Price. If the
<br /> employee or other representative of such public body, parties are unable to agree as to the amount thereof,
<br /> CONTRACTOR shall assume full responsibility for OWNER may make a Claim therefor as provided in
<br /> arranging and obtaining such inspections, tests , or paragraph 10. 05. If, however, such Work is not found
<br /> approvals , pay all costs in connection therewith , and to be defective, CONTRACTOR shall be allowed an
<br /> furnish ENGINEER the required certificates of inspec- increase in the Contract Price or an extension of the
<br /> tion or approval . Contract Times (or Milestones) , or both , directly
<br /> attributable to such uncovering , exposure ,
<br /> D . CONTRACTOR shall be responsible for observation , inspection , testing , replacement, and
<br /> arranging and obtaining and shall pay all costs in reconstruction . If the parties are unable to agree
<br /> as to
<br /> connection with any inspections , tests, or approvals the amount or 'extent thereof, CONTRACTOR may
<br /> required for OWNER's and ENGINEER's acceptance make a Claim therefor as provided in paragraph
<br /> of materials or equipment to be incorporated in the 10 . 05 .
<br /> Work; or acceptance of materials , mix designs , or
<br /> equipment submitted for approval prior to 13 . 05 OWNER May Stop the Work
<br /> CONTRACTOR's purchase thereof for incorporation
<br /> in the Work . Such inspections , tests , or approvals A. if the W9Fk 'is defeGfive , GF GONTRACT-014
<br /> shall be performed by organizations acceptable to
<br /> OWNER and ENGINEER . it, 9F fails te peFfeFFA the WeFk in mateOal. .1
<br /> E . If any Work (or the work of others) that is to the GentFaGt Doeuments , OWNER may eFdeF CON
<br /> be inspected , tested , or approved is covered by CON- TRAGTOR to step the WeFk, 9F aRy peFtion theFegf-,
<br /> TRACTOR without written concurrence of ENGI -
<br /> NEER , it must, if requested by ENGINEER , be uncovhoweyeF, this i:ight of OWNER to step the VV9Fk shall
<br /> -
<br /> ered for observation . not give Ose to any duty 9F; the paFt ef OWNER te
<br /> exemise this Fight f9F the benefit of CONTRACTCR-1
<br /> F . Uncovering Work as provided in paragraph any 8ubG9ntFaGt9F, any SupplieF, any 9theF individual
<br /> 13 . 03 . E shall be at CONTRACTOR 's expense unless
<br /> CONTRACTOR has given ENGINEER timely notice anyeftge+A
<br /> of CONTRACTOR' s intention to cover the same and
<br /> ENGINEER has not acted with reasonable prompt-
<br /> ness in response to such notice.
<br /> 13 . 04 Uncovering Work
<br /> A. If any Worts is covered contrary to the written
<br /> request of ENGINEER , it must, if requested by ENGI -
<br /> NEER, be uncovered for ENGINEER's observation
<br /> and replaced at CONTRACTOR's expense.
<br /> 00700 - General Conditions
<br /> 00700 - 36
<br /> R Engineering\Capital Projects\0217-Powerline Roa"id Documents\00700 - General Conditions.doc
<br />
|