My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-225
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-225
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 2:14:45 PM
Creation date
10/1/2015 12:24:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/15/2008
Control Number
2008-225A
Agenda Item Number
8.H.
Entity Name
J.W. Cheatham,LLC
Subject
Powerline Road Paving
Area
Powerline Road
Project Number
0217
Bid Number
2008029
Supplemental fields
SmeadsoftID
7488
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 - Agreement ( Public Works ) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY , a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida , (hereinafter called <br /> OWNER) <br /> and J . W . Cheatham , LLC <br /> (hereinafter called CONTRACTOR) . <br /> OWNER and CONTRACTOR , in consideration of the mutual covenants hereinafter set forth , <br /> agree as follows : <br /> ARTICLE 1 = WORK <br /> 1 . 01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents . The Work is generally described as follows : <br /> The proiect consists of paving an existing two-lane marl- road with a southbound left turn <br /> at C . R . 510 which includes drainage improvements maintained by Indian River County , <br /> Florida . <br /> ARTICLE 2 = THE PROJECT <br /> 2 . 01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows : <br /> Project Name : Powerline Road from C . R . 510 North to the Sebastian City Limits <br /> County Project Number: 0217 <br /> Project Address : Powerline Road from C . R , 510 North to the Sebastian City Limits <br /> ARTICLE 3 — ENGINEER <br /> 3 . 01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act as OWNER 's representative , assume all duties and responsibilities , and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents , <br /> ARTICLE 4 = CONTRACT TIMES <br /> 4 . 01 Time of the Essence <br /> A. All time limits for Milestones , if any , Substantial Completion , and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> 005.20 - Agreement (Public Works) <br /> 00520 - 2 <br /> FIEngineering%Cepitel Projects10217-Powedine Road\Bid Documents100520 - Agreement (Public Works).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.