My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-225
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-225
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 2:14:45 PM
Creation date
10/1/2015 12:24:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/15/2008
Control Number
2008-225A
Agenda Item Number
8.H.
Entity Name
J.W. Cheatham,LLC
Subject
Powerline Road Paving
Area
Powerline Road
Project Number
0217
Bid Number
2008029
Supplemental fields
SmeadsoftID
7488
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
expressly required by the Contract Documents to be employed by CONTRACTOR , and <br /> safety precautions and programs incident thereto <br /> F . CONTRACTOR does not consider that any further examinations , investigations , <br /> explorations , tests , studies , or data are necessary for the performance of the Work at the <br /> Contract Price , within the Contract Times , and in accordance with the other terms and <br /> conditions of the Contract Documents. <br /> G . CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br /> others at the Site that relates to the Work as indicated in the Contract Documents . <br /> H . CONTRACTOR has correlated the information known to CONTRACTOR, information and <br /> observations obtained from visits to the Site , reports and drawings identified in the <br /> Contract Documents , and all additional examinations , investigations , explorations , tests , <br /> studies , and data with the Contract Documents . <br /> I . CONTRACTOR has given ENGINEER written notice of all conflicts , errors , ambiguities , or <br /> discrepancies that CONTRACTOR has discovered in the Contract Documents , and the <br /> written resolution thereof by ENGINEER is acceptable to CONTRACTOR . <br /> J . The Contract Documents are generally sufficient to indicate and convey understanding of <br /> all terms and conditions for performance and furnishing of the Work. <br /> ARTICLE 9 - CONTRACT DOCUMENTS <br /> 9 . 01 Contents <br /> A . The Contract Documents consist of the following : <br /> 1 . This Agreement (pages 00520- 1 to 00520-9) ; <br /> 2 , Performance Bond (pages 00610- 1 to 00610-5) ; <br /> 3 , Payment Bond (pages 00612-1 to 00612-5) ; <br /> 4 , General Conditions (pages 00700- 1 to 0070045) ; <br /> 5 . Supplementary Conditions (pages 0080- 1 to 0080-8) ; <br /> 6 . Specifications as listed in the table of contents of the Project Manual ; <br /> 7 . Drawings consisting : <br /> A. Proposed Paving and Drainage Improvements , <br /> Project #0217 , dated 10/17/07 . <br /> 8 . Appendices to this Agreement <br /> Appendix A — Permits <br /> Appendix B - Best Management Practices <br /> Appendix C - As-Built Record Survey Checklist <br /> Appendix D - Roadway Soil Survey <br /> 9 . Notice to Proceed (Page 1 , inclusive) <br /> 00520 - Agreement (Public Works) <br /> 00520 - 6 <br /> FAEngineeringlCapital PropctaW217-Power1ine RoedtBid Documente100520 - Agreemwl (Public Works).dx <br />
The URL can be used to link to this page
Your browser does not support the video tag.