17. Drawings—That part of the Contract
<br />Documents prepared or approved by ENGINEER
<br />which graphically shows the scope, extent, and
<br />character of the Work to be performed by
<br />CONTRACTOR. Shop Drawings and other
<br />CONTRACTOR submittals are not Drawings as so
<br />defined.
<br />18. Effective Date of the Agreement—The
<br />date indicated in the Agreement on which it becomes
<br />effective, but if no such date is indicated, it means the
<br />date on which the Agreement is signed and delivered
<br />by the last of the two parties to sign and deliver.
<br />19. ENGINEER—The individual or entity
<br />named as such in the Agreement.
<br />21. Field Order --A written order issued by
<br />ENGINEER which requires minor changes in the
<br />Work but which does not involve a change in the
<br />Contract Price or the Contract Times.
<br />22. General Requirements—Sections of
<br />Division 1 of the Specifications. The General
<br />Requirements pertain to all sections of the Specifica-
<br />tions.
<br />23. Hazardous Environmental Condition—The
<br />presence at the Site of Asbestos, PCBs, Petroleum,
<br />Hazardous Waste, or Radioactive Material in such
<br />quantities or circumstances that may present a
<br />substantial danger to persons or property exposed
<br />thereto in connection with the Work.
<br />24. Hazardous Waste—The term Hazardous
<br />Waste shall have the meaning provided in Section
<br />1004 of the Solid Waste Disposal Act (42 USC
<br />Section 6903) as amended from time to time.
<br />25. Laws and Regulations; Laws or Regulat-
<br />ions --Any and all applicable laws, rules, regulations,
<br />ordinances, codes, and .orders of any and all govem-
<br />mental bodies, agencies, authorities, and courts
<br />having jurisdiction.
<br />26. Liens—Charges, security interests, or
<br />encumbrances upon Project funds, real property, or
<br />personal property.
<br />27. Milestone—A principal event specified in
<br />the Contract Documents relating to an intermediate
<br />completion date or time prior to Substantial Comple-
<br />tion of all the Work.
<br />28. Notice of Award --The written notice by
<br />OWNER to the apparent successful bidder stating that
<br />upon timely compliance by the apparent successful
<br />bidder with the conditions precedent listed therein,
<br />OWNER will sign and deliver the Agreement.
<br />29. Notice to Proceed—A written notice given
<br />by OWNER to CONTRACTOR fixing the date on
<br />which the Contract Times will commence to run and
<br />on which CONTRACTOR shall start to perform the
<br />Work under the Contract Documents.
<br />30. OWNER --The individual, entity, public
<br />body, or authority with whom CONTRACTOR has
<br />entered into the Agreement and for whom the Work is
<br />to be performed.
<br />31. Partial Utilization—Use by OWNER of a
<br />substantially completed part of the Work for the pur-
<br />pose for which it is intended (or a related purpose)
<br />prior to Substantial Completion of all the Work.
<br />32. PCBs --Polychlorinated biphenyls.
<br />33. Petroleum --Petroleum, including crude oil
<br />or any fraction thereof which is liquid at standard
<br />conditions of temperature and pressure (60 degrees
<br />Fahrenheit and 14.7 pounds per square inch
<br />absolute), such as oil, petroleum, fuel oil, oil sludge, oil
<br />refuse, gasoline, kerosene, and oil mixed with other
<br />non -Hazardous Waste and crude oils.
<br />34. Project—The total construction of which
<br />the Work to be performed under the Contract
<br />Documents may be the whole, or a part as may be
<br />indicated elsewhere in the Contract Documents.
<br />35. Project Manual --The bound documentary
<br />information prepared for bidding and constructing the
<br />Work. A listing of the contents of the Project Manual,
<br />which may be bound in one or more volumes, is
<br />contained in the table(s) of contents.
<br />36. Radioactive Material—Source, special
<br />nuclear, or byproduct material as defined by the
<br />Atomic Energy Act of 1954 (42 USC Section 2011 et
<br />seq.) as amended from time to time.
<br />37. Resident Project Representative—The
<br />authorized representative of ENGINEER who may be
<br />assigned to the Site or any part thereof.
<br />38. Samples --Physical examples of
<br />materials, equipment, or workmanship that are
<br />representative of some portion of the Work and which .
<br />00700 - General Conditions
<br />00700-6
<br />FAEngineering\Capital Projects\0217-Powerline Road\Bid Documents\00700 - General Conditions.doc
<br />..
<br />I
<br />_, -
<br />ow 71T7_
<br />ATM 0
<br />21. Field Order --A written order issued by
<br />ENGINEER which requires minor changes in the
<br />Work but which does not involve a change in the
<br />Contract Price or the Contract Times.
<br />22. General Requirements—Sections of
<br />Division 1 of the Specifications. The General
<br />Requirements pertain to all sections of the Specifica-
<br />tions.
<br />23. Hazardous Environmental Condition—The
<br />presence at the Site of Asbestos, PCBs, Petroleum,
<br />Hazardous Waste, or Radioactive Material in such
<br />quantities or circumstances that may present a
<br />substantial danger to persons or property exposed
<br />thereto in connection with the Work.
<br />24. Hazardous Waste—The term Hazardous
<br />Waste shall have the meaning provided in Section
<br />1004 of the Solid Waste Disposal Act (42 USC
<br />Section 6903) as amended from time to time.
<br />25. Laws and Regulations; Laws or Regulat-
<br />ions --Any and all applicable laws, rules, regulations,
<br />ordinances, codes, and .orders of any and all govem-
<br />mental bodies, agencies, authorities, and courts
<br />having jurisdiction.
<br />26. Liens—Charges, security interests, or
<br />encumbrances upon Project funds, real property, or
<br />personal property.
<br />27. Milestone—A principal event specified in
<br />the Contract Documents relating to an intermediate
<br />completion date or time prior to Substantial Comple-
<br />tion of all the Work.
<br />28. Notice of Award --The written notice by
<br />OWNER to the apparent successful bidder stating that
<br />upon timely compliance by the apparent successful
<br />bidder with the conditions precedent listed therein,
<br />OWNER will sign and deliver the Agreement.
<br />29. Notice to Proceed—A written notice given
<br />by OWNER to CONTRACTOR fixing the date on
<br />which the Contract Times will commence to run and
<br />on which CONTRACTOR shall start to perform the
<br />Work under the Contract Documents.
<br />30. OWNER --The individual, entity, public
<br />body, or authority with whom CONTRACTOR has
<br />entered into the Agreement and for whom the Work is
<br />to be performed.
<br />31. Partial Utilization—Use by OWNER of a
<br />substantially completed part of the Work for the pur-
<br />pose for which it is intended (or a related purpose)
<br />prior to Substantial Completion of all the Work.
<br />32. PCBs --Polychlorinated biphenyls.
<br />33. Petroleum --Petroleum, including crude oil
<br />or any fraction thereof which is liquid at standard
<br />conditions of temperature and pressure (60 degrees
<br />Fahrenheit and 14.7 pounds per square inch
<br />absolute), such as oil, petroleum, fuel oil, oil sludge, oil
<br />refuse, gasoline, kerosene, and oil mixed with other
<br />non -Hazardous Waste and crude oils.
<br />34. Project—The total construction of which
<br />the Work to be performed under the Contract
<br />Documents may be the whole, or a part as may be
<br />indicated elsewhere in the Contract Documents.
<br />35. Project Manual --The bound documentary
<br />information prepared for bidding and constructing the
<br />Work. A listing of the contents of the Project Manual,
<br />which may be bound in one or more volumes, is
<br />contained in the table(s) of contents.
<br />36. Radioactive Material—Source, special
<br />nuclear, or byproduct material as defined by the
<br />Atomic Energy Act of 1954 (42 USC Section 2011 et
<br />seq.) as amended from time to time.
<br />37. Resident Project Representative—The
<br />authorized representative of ENGINEER who may be
<br />assigned to the Site or any part thereof.
<br />38. Samples --Physical examples of
<br />materials, equipment, or workmanship that are
<br />representative of some portion of the Work and which .
<br />00700 - General Conditions
<br />00700-6
<br />FAEngineering\Capital Projects\0217-Powerline Road\Bid Documents\00700 - General Conditions.doc