My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-225
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-225
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 2:14:45 PM
Creation date
10/1/2015 12:24:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/15/2008
Control Number
2008-225A
Agenda Item Number
8.H.
Entity Name
J.W. Cheatham,LLC
Subject
Powerline Road Paving
Area
Powerline Road
Project Number
0217
Bid Number
2008029
Supplemental fields
SmeadsoftID
7488
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> thereby; however, CONTRACTOR shall not be liable 2 . 07 Initial Acceptance of Schedules <br /> to OWNER or ENGINEER for failure to report any <br /> conflict, error, ambiguity, or discrepancy in the A. Unless otherwise provided in the Contract <br /> Contract Documents unless CONTRACTOR knew or Documents, at least ten days before submission of the <br /> reasonably should have known thereof. first Application for Payment a conference attended by <br /> CONTRACTOR , ENGINEER , and others as appropri- <br /> B . Preliminary Schedules: Within ten days after ate will be held to review for acceptability to ENGI - <br /> the Effective Date of the Agreement (unless otherwise NEER as provided below the schedules submitted in <br /> specified in the General Requirements) , CONTRAC- accordance with paragraph 2 . 05 . 13. CONTRACTOR <br /> TOIL shall submit to ENGINEER for its timely review: shall have an additional ten days to make corrections <br /> and adjustments and to complete and resubmit the <br /> 1 . a preliminary progress schedule schedules. No progress payment shall be made to <br /> indicating the times (numbers of days or dates) CONTRACTOR until acceptable schedules are <br /> for starting and completing the various stages submitted to ENGINEER. <br /> of the Work, including any. Milestones specified <br /> in the Contract Documents; 1 . The progress schedule will be <br /> acceptable to ENGINEER if it provides an <br /> 2 . a . preliminary schedule of Shop orderly progression of the Work to completion <br /> Drawing and Sample submittals which will list within any specified Milestones and the <br /> each required submittal and the times for sub- Contract Times. Such acceptance will not <br /> miffing , reviewing , and processing such impose on ENGINEER responsibility for the <br /> submittal; and progress schedule, for sequencing , scheduling , <br /> or progress of the Work nor interfere with or <br /> 3 . a preliminary schedule of values for relieve CONTRACTOR from CONTRACTOR' s <br /> all of the Work which includes quantities and full responsibility therefor. <br /> prices of items which when added together <br /> equal the Contract Price and subdivides the 2 . CONTRACTOR's schedule of Shop <br /> Work into component parts in sufficient detail to Drawing and Sample submittals will be <br /> serve as the basis for progress payments acceptable to ENGINEER if it provides a <br /> during performance of the Work. Such prices workable arrangement for reviewing and <br /> will include an appropriate amount of overhead processing the required submittals. <br /> and profit applicable to each item of Work. <br /> 3 . CONTRACTOR's schedule of values <br /> C . Evidenee ef lnsumnGe. BefeFe any WaFk will be acceptable to ENGINEER as to form <br /> the Site is staFted , GONTRACT-014 and OWNER shag and substance if it provides a reasonable <br /> allocation of the Contract Price to component <br /> parts of the Work. <br /> ARTICLE 3 - CONTRACT DOCUMENTS : INTENT , <br /> AMENDING , REUSE <br /> 3 . 01 Intent <br /> AFtoGle 6 . <br /> A. The Contract Documents are comple- <br /> 2 . 06 Preconstruction Conference mentary; what is called for by one is as binding as if <br /> called for by all . <br /> A. Within 40 clays after the GentFaGt Times cite rF <br /> B . It is the intent of the Contract Documents to <br /> , describe a functionally complete Project (or part there- <br /> and etheFs as appiep�ate will be held te establish to be constructed in accordance with the Contract <br /> Documents . Any labor, documentation , services , <br /> materials, or equipment that may reasonably be <br /> inferred from the Contract Documents or from <br /> prevailing custom or trade usage as being required to <br /> Payment, and maintaining FequiFed FeGe produce the intended result will be provided whether <br /> or not specifically called for at no additional cost to <br /> OWNER. <br /> 00700 - General Conditions <br /> 00700 - 9 <br /> P%Engineering\Capital Projectst0217-Powerline RoadSid Documents\00700 - General Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.