Laserfiche WebLink
SECTION 01009 <br /> SPECIAL PROVISIONS <br /> 1 . 1 GENERAL <br /> A . Visits to the construction site may be made by representatives of permitting or <br /> governing bodies . Submit details of all instructions from the above to the ENGINEER <br /> immediately . The Work will not be accepted by the OWNER until final acceptance has <br /> been received from the various Regulatory Agencies having jurisdiction . <br /> B . Furnish sufficient labor, construction equipment and materials , and work such hours , <br /> including night shifts and overtime operations , as may be necessary to insure the <br /> prosecution of the work in accordance with the approved progress schedule . If, in the <br /> opinion of the ENGINEER , the CONTRACTOR falls behind the progress schedule , take <br /> such steps as may be necessary to improve progress , all without additional cost to the <br /> OWNER . The ENGINEER shall be compensated for his overtime services in <br /> accordance with the Supplementary Conditions , SC-6 . 02 . <br /> C . All salvageable material and equipment for which specific use , relocation or other <br /> disposal is not specifically noted , shall remain the property of the OWNER and shall be <br /> delivered to the OWNER at the following location : 4550 41St Street , at the <br /> CONTRACTOR' s expense . All material and equipment not in salvageable condition , as <br /> determined by the ENGINEER and the OWNER , shall be disposed of by the <br /> CONTRACTOR , at the CONTRACTOR's expense . <br /> D . In addition to these Specifications all work must comply with the requirements of the <br /> local governing agency , St . Johns River Water Management District , Department of <br /> Environmental Protection , U . S . Army Corps of Engineers , Sebastian River Water <br /> Control District , and all other applicable State or Federal agencies' specifications and <br /> permits . In the event of a conflict , the more stringent specification or requirement shall <br /> govern . <br /> E . Before performing any work outside the designated limits of the work site , secure any <br /> necessary permits and authorization from the applicable owner , or verify in writing that <br /> such has been previously obtained . Follow all requirements of any said permits or <br /> authorization . Give the ENGINEER and appropriate owner ten ( 10) days minimum <br /> notice before commencing construction operations outside the designated limits of the <br /> work site . Adjacent property owners at time of bidding are listed below : <br /> Chester Wilcox — PID No . 31 -39-30-00000-7000-00002 . 0 <br /> • Donald Beaty — PID No . 31 -39 - 30 -00000-5000-00007 . 0 <br /> Harry & Pauline Jones — PID No . 31 -39-30-00000-5000-00008 . 0 <br /> Kathy Woolsey — PID No . 31 - 39-30-00000-5000-00009 . 0 <br /> • Charles & Kathleen Behler- PID No . 31 -39-30-00000-5000-00014 . 0 <br /> 01009- 1 01009-Special Provisions <br /> FAEngineering\Capital Projects\0217-Powerline Road0d Documents\01009 - special Provisions.doc <br />