Laserfiche WebLink
SECTION 00800 - SUPPLEMENTARY CONDITIONS TO THE <br /> GENERAL CONDITIONS <br /> SC -1 . 00 Introduction <br /> These Supplementary Conditions amend or supplement the Standard General Conditions of the <br /> Construction Contract (No . 1910-8 , 1996 Edition) and other provisions of the Contract <br /> Documents as indicated below . All provisions , which are not so amended or supplemented , <br /> remain in full force and effect . <br /> The terms used in these Supplementary Conditions will have the meanings indicated in the <br /> General Conditions , <br /> SC -1 . 01 Defined Terms <br /> SC- 1 . 01 .A . 20 . Delete paragraph GC 1 . 01 . A . 20 in its entirety. <br /> SC -1 . 02 Terminology <br /> SC- 1 . 02 . D . 1 , 2 , and 3 Delete paragraphs GC4 . 02. D. 10 2, and 3 in their entirety and <br /> insert the following paragraphs in their place: <br /> D . Furnish, Install, Perform, Provide <br /> 1 . The word "furnish" shall mean to supply and deliver services , materials , or <br /> equipment to the Site (or some other specified location) ready for use or <br /> installation and in usable or operable condition . <br /> 2 . The word " install" shall mean to put into use or place in final position services , <br /> materials , or equipment complete and ready for intended use . <br /> 3 . The words " perform" or " provide" shall mean to furnish and install services , <br /> materials , or equipment complete and ready for intended use . <br /> SC -2 . 05 Before Starting Construction <br /> SC-2 . 05 . C . Delete paragraph GC 2. 05. 0 in its entirety and insert the following paragraph in its <br /> place: <br /> C . Evidence of Insurance: CONTRACTOR shall not commence work under this <br /> Contract until he has obtained all insurance required under Article 5 and such <br /> insurance has been delivered to the OWNER and approved by the OWNER , nor <br /> shall the CONTRACTOR allow any Subcontractor to commence work on his <br /> subcontract until all similar insurance required of the Subcontractor has been so <br /> obtained and approved . All such insurance shall remain in effect until final <br /> payment and at all times thereafter when CONTRACTOR may be correcting , <br /> removing or replacing defective Work in accordance with Article 13 . <br /> SC -2 . 06 Preconstruction Conference <br /> SC -2 . 06 Delete paragraph GC406. A in its entirety and insert the following paragraph in its , <br /> place: <br /> A. Immediately after awarding the contract , but before the CONTRACTOR begins <br /> work, the Engineer will call a preconstruction conference at a place the <br /> ENGINEER designates to establish an understanding among the parties as to <br /> the work and to discuss schedules referred to in paragraph 2 . 05 . 6 , procedures <br /> 00800-1 <br /> 00800 - supplementary Conditions <br /> 00800 1 FAEngineering\Capital Projects\0217-Powerline RoacMd Documents\00800 - Supplementary Conditions.doc <br />