Laserfiche WebLink
E . Construction Site Egress Driveways : Minimize the transport of sediment and <br /> soil from the construction site or work area by vehicle wheels . Construct a <br /> crushed rock driving surface at the vehicle exit point(s) . Provide an area large <br /> enough to remove the sediment and soil from vehicle wheels before the vehicle <br /> leaves the construction site or work area . Provide wash-down stations as <br /> required to wash vehicle tires and retain all washwater on -site . <br /> F . Rock and Stone for Erosion Control and Pollution Control and Treatment : <br /> 1 . Crushed Limerock : Crushed limerock shall not be used under any <br /> circumstance . <br /> 2 . Acceptable Material : FDOT #4 non-calcareous aggregate ( usually <br /> granite) , washed and meeting the requirements of FDOT Standard <br /> Specifications for Road and Bridge Construction , Section 901 , <br /> G . Hay Bales : Hay bales shall not be used . <br /> PART 3 - EXECUTION <br /> A . Design , construct , and maintain the pollution control and treatment system to <br /> minimize erosion and capture and remove pollutants from the construction site <br /> and from all other areas disturbed by construction activities . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 104- 1 - Erosion and Water Pollution Control - Lump Sum <br /> (The rest of this page intentionally left blank) <br /> 01025- 10 Technical Specifications <br /> FAEngineering\Capital Projects\0217-Powerline Road\Bid Documents\Technical Specifications. doc <br />