My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-225B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-225B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 2:19:09 PM
Creation date
10/1/2015 12:25:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/15/2008
Control Number
2008-225B
Agenda Item Number
8.H.
Entity Name
J.W. Cheatham,LLC
Subject
Powerline Road Improvements
Area
Powerline Road
Project Number
0217
Bid Number
2008029
Supplemental fields
SmeadsoftID
7491
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01630 <br /> SUBSTITUTIONS <br /> 1 . 1 GENERAL <br /> A . Requests for review of a substitution shall conform to the requirements of <br /> Article 6 . 05 , " Substitutes and Or- Equals , " of the General Conditions , and shall <br /> contain complete data substantiating compliance of the proposed substitution <br /> with the Contract Documents . <br /> 1 . 2 CONTRACTOR' S OPTIONS. <br /> A . For materials or equipment ( hereinafter products) specified only by reference <br /> standard , select product meeting that standard by any manufacturer, fabricator, <br /> supplier or distributor (hereinafter manufacturer) . To the maximum extent <br /> possible , provide products of the same generic kind from a single source . <br /> B . For products specified by naming several products or manufacturers , select any <br /> one of the products or manufacturers named which complies with Specifications . <br /> C . For products specified by naming one or more products or manufacturers and <br /> stating " or equivalent , " submit a request for a substitution for any product or <br /> manufacturer which is not specifically named . <br /> D . For products specified by naming only one product or manufacturer and followed <br /> by words indicating that no substitution is permitted , there is no option and no <br /> substitution will be allowed . <br /> E . Where more than one choice is available as a CONTRACTOR's option , select <br /> product which is compatible with other products already selected or specified . <br /> 1 . 3 SUBSTITUTIONS <br /> A . During a period of 15 days after date of commencement of Contract Time , <br /> ENGINEER will consider written requests from CONTRACTOR for substitution of <br /> products or manufacturers , and construction methods ( if specified ) . <br /> 1 . After end of specified period , requests will be considered only in case of <br /> unavailability of product or other conditions beyond control of <br /> CONTRACTOR . <br /> B . Submit 5 copies of Request for Substitution . Submit a separate request for each <br /> substitution . In addition to requirements set forth in Article 6 . 7 of General Condi- <br /> tions , include in the request the following : <br /> 1 . For products or manufacturers : <br /> a . Product identification , including manufacturer' s name and address . <br /> b . Manufacturer's literature with product description , performance and <br /> test data, and reference standards . <br /> 01630- 1 01630 Substitutions <br /> FAEngineering\Capital Projects\0217-Powerline Road\Bid Documents\01630 - Substitutions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.