My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-014
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 11:49:52 AM
Creation date
9/30/2015 6:15:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/23/2003
Control Number
2003-014
Agenda Item Number
11.C.2.
Entity Name
Taylor Industrial Coatings, Inc.
Subject
Floor coatings for jail showers and kitchen
Area
IR county jail
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
2800
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Taylor's Industrial Coating, Inc. <br /> 108 East North Avenue <br /> Lake Wales,Fl 33853 <br /> Phone 863-676-5093 <br /> Fax 863-676-9573 <br /> Proposal Submitted to Phone Date <br /> Indian River County (772) 567-8000 December 16, 2002 <br /> 1840 25" Street ext. 305 <br /> Vero Beach, FL 32960-3365 <br /> Job Name <br /> Indian River County Correctional Facility <br /> Attn: Bob Baraglia Fag#(772) 770-5095 <br /> We hereby submit specifications and estimates for: <br /> Indian River County Correctional Facility <br /> Scope of Work: All floors will be diamond grinded with vacuums attached to prevent <br /> dust. All walls and ceilings will be sanded with palm sanders and belt sanders. After <br /> preparation is complete the walls and ceilings will be coated with 3 mils of#5381. After <br /> dry a second coat of#5392 will be applied at 5-6 mils. The floor will be troweled with <br /> Bright Cast at 20 mils and broadcasted to rejection. After dry a topcoat of Bright Cast <br /> Clear will be applied at 16 mils to lock in the aggregate. The total floor system will be <br /> 50-55 mils. Price is based on two showers that will be worked on simultaneously; each <br /> pair of showers will be $5,960.00 <br /> Total Pod B - $ 23 840.00 <br /> Total Pod D - $ 23,840.00 Cb <br /> 2003 <br /> Total Pod A- $ 3,000.00 Jls° <br /> Total Kitchen- $ 3,800.00 �'� <br /> . �iYodVtsJ• <br /> *Additional cost for 125%Performance and 100% Payment Bond is $2,758.05. <br /> **All work will de done per specifications provided by Jim Prevatt, Corrosion Specialist <br /> with Hagemyer N.A. Material will be Rust-Oleum—Concrete Protection Systems. <br /> Author <br /> Signature <br /> Greg Taylor <br /> ACCEPTANCE OF PROPOSAL-The above prices,specifications <br /> and conditions are satisfactory and are hereby accepted. You are <br /> authorized to do the work as specified. Payment will be made as <br /> outlined above. <br /> acep <br />
The URL can be used to link to this page
Your browser does not support the video tag.