My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-067
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 9:54:19 AM
Creation date
9/30/2015 6:25:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
03/18/2003
Control Number
2003-067
Agenda Item Number
11.C.1.
Entity Name
The Roof Authority, Inc.
Subject
reroofing Jail-Change Order No. 1
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3189
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Instructions <br /> GENERAL INFORMATION <br /> PURPOSE . This document is intended for use in implementing changes in the Work agreed to by the <br /> Owner, Contractor and Architect. Execution of a completed G701 form indicates agreement upon all the <br /> terms of the change, including any changes in the Contract Sum ( or Guaranteed Maximum Price) and <br /> Contract Time . <br /> RELATED DOCUMENTS . This document was prepared for use under the terms of AIA general conditions, <br /> including AIA Document A201 , General Conditions of the Contract for Construction, and the general <br /> conditions contained in AIA Document A107, Abbreviated Owner-Contractor Agreement Form for <br /> Construction Projects of Limited Scope—Stipulated Sum . <br /> USE OF CURRENT DOCUMENTS. Prior to using any AIA document, the user should consult the AIA, an <br /> AIA component chapter or a current AIA Documents Price List to determine the current edition of each <br /> document . <br /> REPRODUCTIONS. AIA Document G701 is a copyrighted work and may not be reproduced or excerpted <br /> from in substantial part without the express written permission of the AIA. The G7oi document is intend- <br /> ed to be used as a consumable—that is, the original document purchased by the user is intended to be con- <br /> sumed in the course of being used . There is no implied permission to reproduce this- document, nor does <br /> membership in The American Institute of Architects confer any further rights to reproduce G7oi in whole <br /> or in part. <br /> A limited license is hereby granted to retail purchasers to reproduce a maximum of TEN copies of a com- <br /> pleted or executed G7oi , but only for use in connection with a particular project. <br /> COMPLETING THE G701 FORM <br /> DESCRIPTION OF CHANGE IN THE CONTRACT <br /> Insert a detailed description of the change or reference specific exhibits describing in detail the change to <br /> be made in the Contract by this Change Order, including any Drawings, Specifications , documents or <br /> other supporting data to clarify the scope of the change. <br /> DETERMINATION OF COSTS <br /> Insert the following information in the blanks provided, and strike out the terms in parentheses that do <br /> not apply: <br /> • the original Contract Sum or Guaranteed Maximum Price; <br /> • the net change by previously authorized Change Orders ( note that this does not include changes <br /> authorized by Construction Change Directive unless such a change was subsequently agreed to by the <br /> Contractor and recorded as a Change Order) ; <br /> • the Contract Sum or Guaranteed Maximum Price prior to this Change Order; <br /> • the amount of increase or decrease, if any, in the Contract Sum or Guaranteed Maximum Price; <br /> and <br /> • the new Contract Sum or Guaranteed Maximum Price as adjusted by this Change Order. <br /> 0 0 CHANGE IN CONTRACT TIME <br /> oo• •oo Insert the following information in the blanks provided, and strike out the terms in parentheses that do <br /> �-� not apply : <br /> 0 2 000 A I A 0 • the amount in days of the increase or decrease, if any, in the Contract Time; and <br /> AIA DOCUMENT G701-2000 • the date of Substantial Completion , including any adjustment effected by this Change Order. <br /> INSTRUCTIONS <br /> EXECUTION OF THIS DOCUMENT <br /> When the Owner and Contractor, in concurrence with the Architect, have reached agreement on the <br /> change to be made in the Contract , including any adjustments in the Contract Sum ( or Guaranteed <br /> The American Institute Maximum Price ) and Contract Time, the G7oi document should be executed in triplicate by the two par- <br /> of Architects ties and the Architect, each of whom retains an original. <br /> 1735 New York Avenue, N . W. <br /> Washington, D. C. 20006-5292 WARNING: Unlicensed photocopying violates U5. copyright laws and will subject the violator to legal prosecution. <br /> R <br />
The URL can be used to link to this page
Your browser does not support the video tag.