Laserfiche WebLink
t <br /> A. 6" Diameter & 8" Diameter Master Transmission Force Mains on 41 ' Street & Indian River Boulevard: <br /> The DEVELOPER shall furnish and install in accordance with Indian River County' s Wastewater <br /> Master Plan, a sewage force main system along 41 't Street and Indian River Boulevard. The Master <br /> Plan depicts a total the 41 ' Street force main to be constructed east of US Highway # 1 along the 41 ' <br /> Street corridor to the east side of Indian River Boulevard. Approximately 1 ,325 feet of the Master Plan <br /> force main system is constructed. The DEVELOPER will install the balance of master planned force <br /> main for a length of 2,555 feet. 8" and 6" force main will be extended 2,555 feet from the connection <br /> point on 41 " Street to the east side of Indian River Boulevard. The route of the master planned force <br /> main is depicted on Exhibit "C ." <br /> Reimbursement: The COUNTY shall reimburse the DEVELOPER pursuant to the provisions of <br /> Section 20 1 . 11 , The Code of Indian River County, for funds advanced by DEVELOPER to construct <br /> facilities in accordance with the COUNTY' S Master Plan . The COUNTY shall reimburse <br /> DEVELOPER by payment of a check in an amount not to exceed $ 138,594.41 , the estimated COUNTY <br /> share computed in the Riverwind Development Capital Cost Estimate; based on actual construction <br /> improvement costs (see Exhibit D). Payment shall be made by COUNTY to DEVELOPER for the <br /> reimbursable portion of the Master Transmission force main costs following dedication and acceptance <br /> of the utility facilities by Indian River County. <br /> B . The DEVELOPER shall construct a 1 ,850 feet length of 6" diameter force main from the northerly <br /> termination point of the County Master Transmission Main along the east side of Indian River <br /> Boulevard to the Riverwind project site. This portion of force main may serve the sites directly south <br /> of Riverwind known as "Diamond Court" and "Crazy Woman" on the east side of Indian River <br /> Boulevard. In the event a connection is made to the portion of force main north of the Master Plan <br /> termination point, DEVELOPER shall be reimbursed a prorata share of the cost of the non-master <br /> transmission main system along Indian River Boulevard. The cost to be reimbursed will be a prorata <br /> share of the cost for the portion of the Non-Master Plan force main system constructed from the south <br /> property line of Riverwind south to the termination of the Master Plan Force Main System at 41 ' Street <br /> constructed under this Agreement. The portion to be reimbursed has been estimated based upon a <br /> prorata share of acreage times the cost of construction for the portion of Non-Master Plan Force Main <br /> on Indian River Boulevard. The actual cost per lineal foot to be prorated will be established following <br /> acceptance of the system by Indian River County. <br /> The estimated reimbursement from the Diamond Court and Crazy Woman sites is computed as follows: <br /> Cost of Non-Master Plan Force Main System on Indian River Boulevard = $42,738 . 50 <br /> Riverwind 67.01 Acres ( 75%) <br /> Diamond Court 16. 57 Acres ( 18%) <br /> Crazy Woman 6 .70 Acres ( 7%) <br /> 90 .28 Acres ( 100%) <br /> Page 2 of 8 <br />