E. EXIHIB.101
<br /> " ` t
<br /> Kenwood Village Planned Development
<br /> DESCRIPTION UNIT QUANTITY JUNH PRICE TOTAL
<br /> WATER
<br /> 6"PVC C-900 LF 860 $9.50 $8,170.00
<br /> 8" PVC C-900 LF 5080 $11.85 $60,198.00
<br /> 6"Gate Valves EA 3 $450.00 $1,350.00
<br /> 8"Gate Valves EA 10 $625.00 $6,250.00
<br /> Single Service EA 18 $295.00 $5,310.00
<br /> Double Service EA 47 $425.00 $19,975.00
<br /> Fire Hydrant Assembly EA 6 $1,850.00 $11,100.00
<br /> Sample Points EA 8 $160.00 $1,280.00
<br /> Tap/SLV/VLV EA 2 $2,550.00 $5,100.00
<br /> Fill and Flush Connection EA 2 $475.00 $950.00
<br /> Misc.Fittings LS 1 $1,850.00 $1,850.00
<br /> Engineering LS 1 $7,000.00 $7,000.00
<br /> Survey LS 1 $1,850.00 $1,850.00
<br /> Subtotal $128,533.00
<br /> SEWER
<br /> 8"PVC 0-6 Cut LF 1613 $12.00 $19,356.00
<br /> 8"PVC 6-8 Cut LF 2087 $13.50 $28,174.50
<br /> 8"PVC 8-10 Cut LF 989 $15.50 $15,329.50
<br /> 8"PVC 10-12 Cut LF 218 $20.00 $4,360.00
<br /> Manholes 0-6 Cut EA 10 $1,400.00 $14,000.00
<br /> Manholes 6-8 Cut EA 4 $1,550.00 $6,200.00
<br /> Manholes 8-10 Cut EA 4 $1,650.00 $6,600.00
<br /> Manholes 10-12 Cut EA 2 $1,950.00 $3,900.00
<br /> Single Service EA 22 $325.00 $7,150.00
<br /> Double Service_ EA 44 $400.00 $17,600.00
<br /> Lift Station LS 1 $76,500.00 $76,500.00
<br /> 4"PVC Forcemain LF 2360 $7.10 $16,756.00
<br /> 10"x 4" Tap/SLV/VLV EA 1 $1,850.00 $1,850.00
<br /> Misc.Fittings LS 1 $2,000.00 $2,000.00
<br /> Engineering LF 1 $8,250.00 $8,250.00
<br /> Survey LS 1 $2,250.00 $2,250.00 -�–
<br /> Subtotal $230,276.00 C�3
<br /> .i—
<br /> CO
<br /> v `a
<br /> WATER TOTAL r $128,533.00 i J
<br /> SEWER T $230,276.00
<br /> C.J
<br /> TOTAL $358,809.00 co
<br /> TOTAL x 25%
<br /> $89,702.25
<br />
|