My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-222
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 1:13:08 PM
Creation date
9/30/2015 7:59:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/21/2004
Control Number
2004-222
Agenda Item Number
11.J.3
Entity Name
Kimley-Horn and Associates
Subject
Work Order No.3 Services Contract
Clearwell & Yard Piping
Area
South County Water Treatment Plant
Archived Roll/Disk#
3223
Supplemental fields
SmeadsoftID
4288
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 <br /> Proiect Description and Understanding <br /> Improvements to the existing South RO plant PLC and HMI systems are necessary to optimize <br /> automation of the plant operation . These include optimizing chemical feed system loops , alarms, and <br /> loop controls of major system components of the plant. This work will not only include improvements to <br /> the automation of the South RO plant operations , but will be used as a foundation for future integration of <br /> the water and wastewater control systems . <br /> This scope of work is identified as Phase I improvements to the overall utility systems integration of both <br /> water and wastewater plants . In anticipation of centralizing operations at the new Emergency Operations <br /> Center (EOC) , improvements to the control systems at the South RO plant is recommended as the first <br /> phase of integrating all water and wastewater treatment systems . <br /> Scope of Services <br /> See attached Exhibit A . <br /> Schedule <br /> The scope described above is anticipated to take approximately three months from notice to proceed . . <br /> Fees <br /> Consultant will provide these Services as described herein on a lump sum basis for $69 ,000 : <br /> The fees and services stated in this Agreement are valid until December 31 , 2004 . <br /> Consultant will provide these Services in accordance with our non-exclusive professional engineering <br /> agreement approved by the Board of County Commissioners on March 16th, 2004 between Indian River <br /> County and Kimley-Horn and Associates , Inc . <br /> HAGenerahMiller\Indian River Comty\South Plant SCADA Proposal-revl .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.