Laserfiche WebLink
ATTACHMENT 1 <br /> Proiect Description and Understanding <br /> Improvements to the existing South RO plant PLC and HMI systems are necessary to optimize <br /> automation of the plant operation . These include optimizing chemical feed system loops , alarms, and <br /> loop controls of major system components of the plant. This work will not only include improvements to <br /> the automation of the South RO plant operations , but will be used as a foundation for future integration of <br /> the water and wastewater control systems . <br /> This scope of work is identified as Phase I improvements to the overall utility systems integration of both <br /> water and wastewater plants . In anticipation of centralizing operations at the new Emergency Operations <br /> Center (EOC) , improvements to the control systems at the South RO plant is recommended as the first <br /> phase of integrating all water and wastewater treatment systems . <br /> Scope of Services <br /> See attached Exhibit A . <br /> Schedule <br /> The scope described above is anticipated to take approximately three months from notice to proceed . . <br /> Fees <br /> Consultant will provide these Services as described herein on a lump sum basis for $69 ,000 : <br /> The fees and services stated in this Agreement are valid until December 31 , 2004 . <br /> Consultant will provide these Services in accordance with our non-exclusive professional engineering <br /> agreement approved by the Board of County Commissioners on March 16th, 2004 between Indian River <br /> County and Kimley-Horn and Associates , Inc . <br /> HAGenerahMiller\Indian River Comty\South Plant SCADA Proposal-revl .doc <br />